ГЛОБАЛЬНЫЙ РЕФАКТОРИНГ АРХИТЕКТУРЫ - Рефакторинг этапов Stage 3.8 - юи
This commit is contained in:
@@ -2592,9 +2592,26 @@ Acceptance (Stage 3):
|
||||
1. LLM outputs strictly validated schema for extraction/decomposition (no free-form).
|
||||
2. Deterministic guards can block or downgrade answers when evidence insufficient.
|
||||
3. False route drifts and generic responses reduced in regression packs.
|
||||
4. Manual markup shows increase in “correct/grounded” labels.
|
||||
4. Manual markup shows increase in correct/grounded labels.
|
||||
|
||||
Status: In validation (functional gates green; manual re-markup trend confirmation pending)
|
||||
### Stage 3 Exit Audit (2026-04-11)
|
||||
1. Functional gate:
|
||||
- `npm --prefix llm_normalizer/backend run build` passed.
|
||||
2. Regression gate:
|
||||
- Stage 3 focused suite passed: `9 files / 356 tests`.
|
||||
- (`addressQueryRuntimeM23`, `assistantWave17RunRegression20260411`, `assistantWave18ManualCommentsRegression`,
|
||||
`assistantLivingRouter`, `assistantLivingChatMode`, `assistantSoftPolicyReply`,
|
||||
`assistantBoundaryFallbackReply`, `assistantAnswerPolicyV11`, `assistantSemanticExtractionContract`).
|
||||
3. Runtime stability gate:
|
||||
- address lane includes protective fallback for legacy MCP schema error (`SubcontoDt1`) and avoids hard execution drop for debt-lifecycle receivables prompts.
|
||||
4. Manual smoke:
|
||||
- reviewer confirmed fixed questions on latest spot checks; domain breadth expansion is tracked separately and is not a Stage 3 blocker.
|
||||
5. Full backend suite note (non-blocking for Stage 4 kickoff):
|
||||
- `npm --prefix llm_normalizer/backend run test` reports red integration groups with `5000ms` timeout budget (`assistantEvalHarness`, `assistantP0EvalHarness`, `assistantStage2EvalHarness`, `assistantStage3LifecycleAcceptanceProbe`, part of `assistantEndpoint`/`assistantBroadGuard`).
|
||||
- one user-facing policy assertion currently diverges when live MCP returns aborted fetch (`This operation was aborted`), producing execution-error soft reply instead of expected clarification template.
|
||||
- these failures are tracked as stability/infra debt and do not block Stage 4 answer-layer kickoff for already green Stage 3 focused contract pack.
|
||||
|
||||
Status: Completed (Stage 3 gate approved; domain expansion moved to Stage 5 backlog)
|
||||
|
||||
## Stage 4 (P2): Human-Centric Answer Layer
|
||||
|
||||
@@ -2607,7 +2624,12 @@ Goal:
|
||||
- best next step.
|
||||
2. Keep claim-to-evidence binding strict.
|
||||
|
||||
Status: Planned
|
||||
Stage 4 kickoff preconditions:
|
||||
1. Stage 3 functional + regression gates are green.
|
||||
2. No route/MCP interface changes are required to start Stage 4.
|
||||
3. Remaining acknowledged risk: domain coverage is still limited and will be expanded iteratively.
|
||||
|
||||
Status: Ready to start (kickoff approved on 2026-04-11)
|
||||
|
||||
## Stage 5 (P3): Quality Loop Driven By GUI Markup
|
||||
|
||||
|
||||
Reference in New Issue
Block a user