Semantic Gate: закрепить бизнес-аудит и executive summary
This commit is contained in:
@@ -27,7 +27,7 @@ Current reporting baseline:
|
||||
- Post-F Semantic Integrity Hardening: `99%`, operationally closed/regression gate.
|
||||
- Planner Autonomy Consolidation: `100%` for the declared phase83 slice.
|
||||
- Open-World Business Overview implementation breadth: `~99%` through Slice 25.
|
||||
- Active next pressure: `Open-World Semantic Control Gate`, accepted module progress `~96%` after the second local control-gate cut.
|
||||
- Active next pressure: `Open-World Semantic Control Gate`, accepted module progress `~98%` after the EHMO-derived critical subset accepted live; fat GUI pack review remains before full closure.
|
||||
|
||||
## Archived Execution Snapshot (2026-04-17)
|
||||
|
||||
|
||||
@@ -17,8 +17,9 @@ It did not reopen Post-F and it did not prove that the Open-World implementation
|
||||
From this point forward:
|
||||
|
||||
- `~99%` for Open-World means implementation breadth through `Business Overview Missing Proof Ledger`;
|
||||
- accepted module progress is `~96%` after the second local Semantic Control Gate cut, and remains below closure until the EHMO-derived subset is rerun;
|
||||
- the active work is control-gate hardening, not immediate expansion into more proof families.
|
||||
- accepted module progress is `~98%` after the EHMO-derived Semantic Control Gate subset accepted live at `21/21`;
|
||||
- the active work is finishing the control-gate closure surface, not immediate expansion into more proof families.
|
||||
- full `100%` is still held back until the fat manual GUI pack is rerun/reviewed or remaining rough answers are explicitly classified outside the declared contour.
|
||||
|
||||
For the current execution spine, read `23 - current_execution_spine_and_semantic_control_gate_2026-05-05.md`.
|
||||
|
||||
@@ -55,7 +56,7 @@ For the current execution spine, read `23 - current_execution_spine_and_semantic
|
||||
- Completed active slice: `Business Overview Missing Proof Ledger`: business overview now records machine-readable hard proof gaps for accounting profit/margin, due-date debt aging, inventory reserve/liquidation quality, and vendor/procurement quality, distinguishing proxy-only evidence from reviewed routes that are not wired yet.
|
||||
- Implementation breadth: `~99% (Open-World Bounded Autonomy Breadth through Slice 25)`.
|
||||
- Next active slice: `Open-World Semantic Control Gate`, covering garbage-anchor protection, business-overview continuation, intent dominance, frame hygiene, counterparty/organization arbitration, and final-summary answer shape.
|
||||
- Active module progress: `~96% (Open-World Bounded Autonomy Breadth, active slice: Semantic Control Gate)`.
|
||||
- Active module progress: `~98% (Open-World Bounded Autonomy Breadth, active slice: Semantic Control Gate)`.
|
||||
|
||||
## Reporting Rule
|
||||
|
||||
@@ -63,15 +64,15 @@ Use these labels when reporting progress:
|
||||
|
||||
- `Прогресс модуля: 99% (Post-F Semantic Integrity Hardening, operationally closed/regression gate)` when discussing the Post-F slice itself.
|
||||
- `Прогресс модуля: 100% (Planner Autonomy Consolidation, declared phase83 slice closed)` when discussing the planner-autonomy slice that was just completed.
|
||||
- `Прогресс модуля: 96% (Open-World Bounded Autonomy Breadth, active slice: Semantic Control Gate)` while discussing current module closure after the second local Semantic Control Gate cut.
|
||||
- `Open-World Business Overview implementation breadth: ~99%, semantic acceptance gate still open` when discussing only the already wired Slice 25 breadth.
|
||||
- `Прогресс модуля: 98% (Open-World Bounded Autonomy Breadth, active slice: Semantic Control Gate)` while discussing current module closure after the EHMO-derived critical subset accepted live.
|
||||
- `Open-World Business Overview implementation breadth: ~99%, Semantic Control Gate critical subset accepted, fat GUI pack still pending` when discussing only the already wired Slice 25 breadth.
|
||||
- `Прогресс модуля: X% (Open-World Bounded Autonomy Breadth, active slice: <name>)` for later breadth work after the Semantic Control Gate is accepted.
|
||||
|
||||
Do not report Post-F as `78%`, `87%`, or `92%`.
|
||||
|
||||
Do not report Planner Autonomy as still open unless the discussion is about the next broader module, not the declared phase83 closure target.
|
||||
|
||||
Do not report Open-World as simply `99% closed` until the EHMO-derived semantic control gate passes replay review.
|
||||
Do not report Open-World as simply `99% closed` until the fat manual GUI pack is rerun/reviewed or remaining residuals are explicitly classified.
|
||||
|
||||
## What Is Actually Closed
|
||||
|
||||
@@ -96,7 +97,7 @@ The project is not yet a universal arbitrary-1C agent.
|
||||
|
||||
Remaining work belongs to the next breadth module:
|
||||
|
||||
- close the `Open-World Semantic Control Gate` opened by `assistant-stage1-EHMOy3lNFt`;
|
||||
- finish closure of the `Open-World Semantic Control Gate` opened by `assistant-stage1-EHMOy3lNFt`; the EHMO-derived critical subset is accepted live, but the fat GUI pack and residual answer-shape roughness still need final review;
|
||||
- extend `business_overview` beyond money-flow/activity, customer and supplier concentration, document/account-section activity mix, counterparty role split, contract usage, yearly operating-flow dynamics, explicit profit/margin wording boundaries, explicit debt due-date wording boundaries, explicit inventory reserve/liquidation wording boundaries, explicit supplier/procurement-quality wording boundaries, explicit-period VAT/tax, as-of-date debt position, open-settlement concentration, contract-date debt age, debt staleness-risk proxy, as-of-date inventory position, trading-margin proxy, sales-to-stock inventory proxy, warehouse staleness-risk proxy, and the missing-proof ledger into separately proven exact accounting profit/margin, due-date debt aging/overdue, confirmed vendor-risk/procurement-quality analysis, and confirmed reserve/write-off/liquidation inventory evidence families;
|
||||
- broader dynamic schema traversal for unfamiliar 1C asks;
|
||||
- more primitive descriptors where live evidence proves a real gap;
|
||||
|
||||
+20
-4
@@ -779,7 +779,7 @@ Suggested first subset:
|
||||
Current status:
|
||||
|
||||
- implementation breadth through Slice 25: `~99%`;
|
||||
- accepted Open-World module progress after the second local Semantic Control Gate cut: `~96%`;
|
||||
- accepted Open-World module progress after the EHMO-derived Semantic Control Gate subset accepted live: `~98%`;
|
||||
- exact P&L, real due-date debt aging, reserve/write-off/liquidation evidence, and vendor-risk engines stay queued behind this semantic gate.
|
||||
|
||||
### Slice 26 local cut 1 - anchor hygiene and overview continuation
|
||||
@@ -814,8 +814,24 @@ Local validation is accepted for this cut:
|
||||
- `npm.cmd run build`: passed.
|
||||
- graphify rebuild after Slice 26 local cut 2: `6076 nodes`, `13247 edges`, `138 communities`.
|
||||
|
||||
### Slice 26 local cut 3 - business-audit and executive-summary control
|
||||
|
||||
Implemented now:
|
||||
|
||||
- broad business-audit wording with noisy capability-meta phrases, such as "what can we say", stays in bounded business overview synthesis instead of falling into capability-list help;
|
||||
- final `executive summary` wording over the whole conversation is handled by deterministic memory synthesis with confirmed facts, proxy boundaries, missing evidence, and manual-check sections;
|
||||
- recap fact construction filters low-quality pseudo-counterparty anchors such as standalone service prepositions before they can leak into the final answer.
|
||||
|
||||
Validation is accepted for this cut:
|
||||
|
||||
- `npm.cmd test -- assistantMemoryRecapPolicy.test.ts assistantLivingChatRuntimeAdapter.test.ts assistantRoutePolicy.test.ts assistantLivingModePolicy.test.ts`: passed `54/54`.
|
||||
- `npm.cmd test -- assistantLivingRouter.test.ts assistantLivingChatMode.test.ts assistantAgentSemanticRunInventoryRegression.test.ts assistantTurnMeaningPolicy.test.ts`: passed `90/90`.
|
||||
- `npm.cmd run build`: passed.
|
||||
- `address_truth_harness_phase89_open_world_semantic_control_gate_ehmo_subset_live_fix4_20260505`: accepted `21/21`, `0` warnings, MCP live-readiness `ready`.
|
||||
- graphify rebuild after this cut: `6081 nodes`, `13263 edges`, `140 communities`.
|
||||
|
||||
Remaining before acceptance:
|
||||
|
||||
- rerun the EHMO-derived semantic subset;
|
||||
- continue W5 and any EHMO-revealed W3/W4/W6 gaps for counterparty/organization arbitration, remaining wrong-lane prevention, frame reset, and final-summary answer lane;
|
||||
- only then rerun the fat manual GUI pack for acceptance.
|
||||
- keep the EHMO-derived semantic subset as a regression gate for nearby edits;
|
||||
- review remaining W5/SVK answer-shape roughness for counterparty/organization arbitration after pivots;
|
||||
- rerun the fat manual GUI pack for final acceptance or explicitly classify residuals outside the declared contour.
|
||||
|
||||
+24
-11
@@ -66,12 +66,12 @@ This gate is not a request to tune the assistant for every weird question in tha
|
||||
Current status should be reported as:
|
||||
|
||||
- implementation breadth: `~99%` for Open-World Business Overview through Slice 25;
|
||||
- accepted module progress: `~96% (Open-World Bounded Autonomy Breadth, active slice: Semantic Control Gate)`.
|
||||
- accepted module progress: `~98% (Open-World Bounded Autonomy Breadth, active slice: Semantic Control Gate)`.
|
||||
|
||||
This is not a regression from `99%` to `96%`. It is a metric split:
|
||||
|
||||
- `99%` describes wired breadth;
|
||||
- `96%` describes closure confidence after the second local control-gate cut; the gate is still not accepted without EHMO-subset replay.
|
||||
- `98%` describes closure confidence after the EHMO-derived critical subset passed live replay; the gate is still not full module closure until the fat manual GUI pack and remaining answer-shape residuals are reviewed.
|
||||
|
||||
## Current Local Cut
|
||||
|
||||
@@ -88,7 +88,13 @@ Local cut 2 is implemented:
|
||||
- W6 starter: final next-step summary wording after business overview stays in the bounded overview lane and does not invent document/counterparty subjects.
|
||||
- Business-overview frame hygiene now suppresses stale follow-up counterparties when the current turn is a broad overview continuation.
|
||||
|
||||
This is local evidence only. It improves the gate but does not close it until the EHMO-derived subset and the fat manual pack are semantically reviewed again.
|
||||
Local cut 3 is implemented:
|
||||
|
||||
- W2/W3: broad business-audit wording such as "what can we say" now overrides noisy capability-meta cues and stays in the business-overview synthesis lane.
|
||||
- W6: final `executive summary` / "confirmed, proxy, missing evidence, manual checks" wording is handled as deterministic conversation memory synthesis instead of generic address lookup.
|
||||
- W1/W6 hygiene: low-quality recap counterparty anchors such as standalone service prepositions are suppressed before they can appear as `«для»`-style pseudo-counterparties in the final answer.
|
||||
|
||||
The EHMO-derived critical subset is now live-accepted. The remaining gate pressure is the fat manual GUI pack and known residual answer-shape roughness around selected counterparty money/document/movement follow-ups.
|
||||
|
||||
## Failure Classes To Fix
|
||||
|
||||
@@ -127,9 +133,9 @@ Each work unit should add focused local tests and then be validated against the
|
||||
|
||||
## Acceptance Gate
|
||||
|
||||
The current module can move from `~96%` toward closure only after:
|
||||
The current module can move from `~98%` toward closure only after:
|
||||
|
||||
- the EHMO-derived critical subset is rerun and semantically reviewed;
|
||||
- the EHMO-derived critical subset remains accepted after future nearby edits;
|
||||
- old canaries remain green: Post-F, phase83, inventory selected-object, VAT continuity, SVK document/movement chains;
|
||||
- broad business overview still answers from confirmed/proxy/missing evidence rather than unsupported confidence;
|
||||
- no stale organization/counterparty/date/selected-object contamination appears in the reviewed subset;
|
||||
@@ -155,20 +161,27 @@ Manual runtime run reviewed as the gate opener:
|
||||
- report: `llm_normalizer/reports/assistant-stage1-EHMOy3lNFt.md`
|
||||
- session: `llm_normalizer/data/assistant_sessions/assistant-stage1-EHMOy3lNFt-SAVED-001.json`
|
||||
|
||||
Live EHMO-derived critical subset proof:
|
||||
|
||||
- spec: `docs/orchestration/address_truth_harness_phase89_open_world_semantic_control_gate_ehmo_subset.json`
|
||||
- run: `artifacts/domain_runs/address_truth_harness_phase89_open_world_semantic_control_gate_ehmo_subset_live_fix4_20260505`
|
||||
- result: `accepted`, `21/21`, `0` warnings, MCP live-readiness `ready`
|
||||
- key covered repairs: business-audit synthesis no longer falls into capability help; final executive summary uses confirmed/proxy/missing/manual-check sections and filters pseudo-counterparty garbage.
|
||||
|
||||
Graphify snapshot at this status cut:
|
||||
|
||||
- `6076 nodes`
|
||||
- `13247 edges`
|
||||
- `138 communities`
|
||||
- `6081 nodes`
|
||||
- `13263 edges`
|
||||
- `140 communities`
|
||||
|
||||
## Reporting Rule
|
||||
|
||||
Until the semantic control gate is accepted, use:
|
||||
Until the fat manual GUI pack is reviewed or residuals are explicitly classified, use:
|
||||
|
||||
`Прогресс модуля: 96% (Open-World Bounded Autonomy Breadth, active slice: Semantic Control Gate)`
|
||||
`Прогресс модуля: 98% (Open-World Bounded Autonomy Breadth, active slice: Semantic Control Gate)`
|
||||
|
||||
If discussing only the already wired business-overview breadth, say:
|
||||
|
||||
`Open-World Business Overview implementation breadth: ~99%, semantic acceptance gate still open`
|
||||
`Open-World Business Overview implementation breadth: ~99%, Semantic Control Gate critical subset accepted, fat GUI pack still pending`
|
||||
|
||||
Do not collapse those two statements into one number.
|
||||
|
||||
@@ -144,11 +144,11 @@ Current honest status:
|
||||
- bounded-autonomy foundation readiness: `~89%`
|
||||
- open-world bounded-autonomy readiness: `~87%`
|
||||
- active Open-World Bounded Autonomy Breadth implementation breadth: `~99%`, with business-overview evidence fusion, the reviewed `business_overview` catalog/data-need/planner route-fabric slice, the fresh multi-probe runtime bridge, the explicit-period VAT/tax fact-family bridge, the explicit-period debt-position bridge, the explicit-date inventory-position bridge, the open-settlement quality bridge accepted by live semantic replay, selected-item profitability bridged by local semantic/runtime regression tests, contract-date debt age bridged locally, debt staleness-risk proxy bridged locally, debt due-date boundary arbitration bridged locally, inventory reserve/liquidation boundary arbitration bridged locally, supplier/procurement-quality boundary arbitration bridged locally, supplier concentration proxy bridged locally, document/account-section activity profile bridged locally, counterparty population/roles and contract usage profiles bridged locally, yearly operating-flow proxy bridged locally, earnings/best-year wording arbitration bridged locally, profit/margin wording boundary arbitration bridged locally, analyst synthesis added to business-overview answer drafting, company-period trading margin proxy bridged locally, inventory sales-to-stock proxy bridged locally, inventory staleness-risk proxy bridged locally, gap-specific answer shaping bridged locally, and missing proof families recorded as runtime evidence ledger; exact accounting profit/margin, true due-date debt aging/overdue, confirmed vendor-risk/procurement-quality analysis, and confirmed reserve/write-off/liquidation inventory evidence are still pending
|
||||
- active Open-World Bounded Autonomy Breadth accepted-module progress: `~96%`, because local `Open-World Semantic Control Gate` cuts now cover anchor hygiene, overview continuation, debt-position intent dominance, metadata topic-switch frame reset, and final-summary continuation, but EHMO-subset replay is still pending
|
||||
- active Open-World Bounded Autonomy Breadth accepted-module progress: `~98%`, because the EHMO-derived `Open-World Semantic Control Gate` critical subset now accepts live at `21/21`; full closure is still held back for the fat manual GUI pack and remaining answer-shape residual review
|
||||
- Post-F semantic integrity module progress: `~99%` operationally closed, with remaining risk now treated as next-slice discovery rather than an open blocker inside the closed slice
|
||||
- active inventory-stock breadth slice progress: `100%` for the declared scenario pack, not for arbitrary inventory questions
|
||||
- Planner Autonomy Consolidation progress: `100%` for the declared module, with catalog-fabric, value-flow arbitration, lifecycle bounded inference, broad-evaluation bridge, inventory catalog templates, inventory runtime-boundary honesty, exact inventory recipe bridging, unambiguous metadata-surface lane inference, catalog chain-template scoring, structured chain-match contract exposure, runtime/debug propagation, subject-aware bidirectional comparison arbitration, structured catalog-alignment verdicts, representative alignment regression guard, catalog-alignment reason-code telemetry, explicit `alignment_status` propagation, truth-harness/acceptance-matrix surfacing, soft divergence warning, `catalog_alignment_ok` acceptance invariant, step-level expected catalog-alignment assertions, phase66 and phase32 spec alignment expectations, AGENT source-catalog surfacing, generated phase83 mixed planner-brain replay spec, checked-source user-facing error sanitation, surface-grounded catalog promotion, and guarded live phase83 acceptance validated. Broader unfamiliar 1C asks are now next-module breadth work rather than an open blocker inside this declared slice
|
||||
- graph snapshot after latest rebuild: `6076 nodes`, `13247 edges`, `138 communities`
|
||||
- graph snapshot after latest rebuild: `6081 nodes`, `13263 edges`, `140 communities`
|
||||
- current regression-gate breakpoint:
|
||||
- the validated hot paths are no longer structurally broken;
|
||||
- flagship continuity collapse is no longer the primary risk;
|
||||
@@ -177,6 +177,7 @@ Latest live proof now includes:
|
||||
- `address_truth_harness_phase82_human_mixed_integrity_status_dialog_post_f_account_injection_guard_clean_scope` accepted `19/19`, with the `Жуковке 51` numeric counterparty suffix kept as counterparty scope instead of leaking as account `51`
|
||||
- `address_truth_harness_post_f_cross_stage_canary_agent_20260424_live7` accepted `24/24`, proving a saved cross-stage AGENT canary across VAT metadata, metadata-scoped organization/document pivots, numeric counterparty suffixes, open-organization value-flow clarification, ranked value-flow year switches, and SVK grounded reset; the saved autorun is `AGENT | Post-F cross-stage semantic integrity canary` (`gen-ag04241406-abe4d8`)
|
||||
- `address_truth_harness_post_f_manual_failures_20260424_live3` accepted `11/11`, proving the manual failure slice from `assistant-stage1-9liEOh-7JP`: VAT purchase-date, VAT February 2017, highest-value customer, and Chepurnov item-flow after stale inventory context; the saved autorun is `AGENT | Post-F ручные провалы VAT revenue item-flow live3` (`gen-ag04241710-bdb248`)
|
||||
- `address_truth_harness_phase89_open_world_semantic_control_gate_ehmo_subset_live_fix4_20260505` accepted `21/21`, proving the EHMO-derived Semantic Control Gate subset after business-audit lane repair, final executive-summary memory synthesis, and pseudo-counterparty recap filtering
|
||||
- `address_truth_harness_phase11_manual_followup_meta_quality_live_rerun_vatfix` accepted `10/10`
|
||||
- `address_truth_harness_phase20_continuity_stabilization_live_rerun_vatfix` accepted `6/6`
|
||||
- `addressQueryRuntimeM23.test.ts` full semantic/runtime slice accepted `403/403` after Post-F VAT/date-basis, scope-recovery, open value-flow organization clarification, document-vs-bank arbitration, and reply-shape hardening
|
||||
@@ -203,7 +204,7 @@ Latest live proof now includes:
|
||||
- business-overview supplier concentration proxy accepted locally: targeted executor/answer-adapter slice passed `66/66` with `1` skipped; M23 route/runtime regression passed `412/412`; build passed; graphify rebuilt to `6041 nodes`, `13162 edges`, `136 communities`; the proxy ranks confirmed outgoing payment counterparties while vendor risk, procurement quality, and full expense structure remain unclaimed
|
||||
- business-overview yearly operating-flow proxy accepted locally: targeted executor/answer-adapter slice passed `66/66` with `1` skipped; M23 route/runtime regression passed `412/412`; build passed; graphify rebuilt to `6047 nodes`, `13177 edges`, `139 communities`; the proxy builds annual incoming/outgoing/net buckets from confirmed money-flow rows while profit, финрезультат, and full P&L remain unclaimed
|
||||
- business-overview missing proof ledger accepted locally: targeted executor/answer-adapter slice passed `66/66` with `1` skipped; M23 route/runtime regression passed `416/416`; build passed; graphify count is recorded in the current graph snapshot; hard remaining proof gaps are now visible as machine-readable `missing_proof_families` rather than only prose warnings
|
||||
- semantic control gate local cuts accepted locally: adapter/resolver focused regressions passed `98/98` with `6` skipped; broader address counterparty/M23/adapter/resolver slice passed `519/519` with `6` skipped; build passed; graphify rebuilt to `6076 nodes`, `13247 edges`, `138 communities`; EHMO-derived semantic replay remains the acceptance gate
|
||||
- semantic control gate critical subset accepted live: focused W2/W3/W6 regressions passed `54/54`; broader living/router semantic slice passed `90/90`; build passed; EHMO-derived replay `address_truth_harness_phase89_open_world_semantic_control_gate_ehmo_subset_live_fix4_20260505` accepted `21/21` with `0` warnings; graphify rebuilt to `6081 nodes`, `13263 edges`, `140 communities`; fat manual GUI pack remains the closure check
|
||||
- business-overview earnings wording arbitration accepted locally: turn-meaning/turn-input slice passed `85/85` with `6` skipped; M23 route/runtime regression passed `412/412`; runtime-entry/pilot/answer slice passed `85/85` with `3` skipped; build passed; graphify rebuilt to `6052 nodes`, `13187 edges`, `138 communities`; organization-level earnings/best-year wording now reaches `business_overview` while explicit customer/counterparty ranking remains in exact customer value routes
|
||||
- inventory template lift accepted locally: catalog/data-need/planner/turn-input slice passed `139/139` with `6` skipped; full MCP-discovery slice passed `276/276` with `9` skipped; build passed; graphify stayed at `5912 nodes`, `12833 edges`, `138 communities`
|
||||
- inventory runtime-boundary hardening accepted locally: runtime-bridge/answer-adapter/pilot-executor slice passed `68/68` with `1` skipped; full MCP-discovery slice passed `277/277` with `9` skipped; build passed; graphify rebuilt to `5913 nodes`, `12837 edges`, `138 communities`
|
||||
|
||||
Reference in New Issue
Block a user