Документы: зафиксировать Open-World Semantic Control Gate
This commit is contained in:
@@ -20,12 +20,14 @@ Current status is tracked in:
|
||||
|
||||
- [README.md](./README.md)
|
||||
- [21 - current_status_canon_2026-05-01.md](./21%20-%20current_status_canon_2026-05-01.md)
|
||||
- [23 - current_execution_spine_and_semantic_control_gate_2026-05-05.md](./23%20-%20current_execution_spine_and_semantic_control_gate_2026-05-05.md)
|
||||
|
||||
Current reporting baseline:
|
||||
|
||||
- Post-F Semantic Integrity Hardening: `99%`, operationally closed/regression gate.
|
||||
- Planner Autonomy Consolidation: `100%` for the declared phase83 slice.
|
||||
- Active next pressure: broader Open-World Bounded Autonomy Breadth over unfamiliar 1C asks.
|
||||
- Open-World Business Overview implementation breadth: `~99%` through Slice 25.
|
||||
- Active next pressure: `Open-World Semantic Control Gate`, accepted module progress `~93%` after manual replay `assistant-stage1-EHMOy3lNFt`.
|
||||
|
||||
## Archived Execution Snapshot (2026-04-17)
|
||||
|
||||
|
||||
@@ -8,6 +8,20 @@ It exists to prevent stale percentage drift in planning discussions.
|
||||
|
||||
If another document says `78%`, `87%`, `92%`, or `85%` for a module that is now closed, read that value as a historical snapshot unless this note explicitly repeats it as current.
|
||||
|
||||
## 2026-05-05 Overlay - EHMO Manual QA Gate
|
||||
|
||||
The manual GUI replay `assistant-stage1-EHMOy3lNFt` changed the status wording.
|
||||
|
||||
It did not reopen Post-F and it did not prove that the Open-World implementation breadth collapsed. It opened a new acceptance gate for semantic control under broad human-style dialogue pressure.
|
||||
|
||||
From this point forward:
|
||||
|
||||
- `~99%` for Open-World means implementation breadth through `Business Overview Missing Proof Ledger`;
|
||||
- accepted module progress is `~93%` until the new `Open-World Semantic Control Gate` is fixed and rerun;
|
||||
- the active work is control-gate hardening, not immediate expansion into more proof families.
|
||||
|
||||
For the current execution spine, read `23 - current_execution_spine_and_semantic_control_gate_2026-05-05.md`.
|
||||
|
||||
## Current Module Map
|
||||
|
||||
- `Post-F Semantic Integrity Hardening`: `99%`, operationally closed as a hardening slice and now used as a regression gate.
|
||||
@@ -39,8 +53,9 @@ If another document says `78%`, `87%`, `92%`, or `85%` for a module that is now
|
||||
- Completed active slice: `Business Overview Document/Account Activity Profile Bridge`: business overview now executes the reviewed `document_type_and_account_section_profile` recipe and surfaces confirmed operational activity mix without claiming process quality, accounting correctness, or complete 1C activity coverage.
|
||||
- Completed active slice: `Business Overview Counterparty/Contract Profile Bridge`: business overview now executes reviewed `counterparty_population_and_roles` and `contract_usage_overview` recipes, surfacing active counterparty role split and contract usage without claiming CRM quality, counterparty due diligence, legal completeness, or contract-risk.
|
||||
- Completed active slice: `Business Overview Missing Proof Ledger`: business overview now records machine-readable hard proof gaps for accounting profit/margin, due-date debt aging, inventory reserve/liquidation quality, and vendor/procurement quality, distinguishing proxy-only evidence from reviewed routes that are not wired yet.
|
||||
- Next active slice: continue breadth into exact company-wide accounting profit/margin, real due-date debt aging, confirmed inventory reserve/write-off/liquidation evidence, and broader unfamiliar 1C route families only where reviewed evidence routes exist.
|
||||
- Active module progress: `~99% (Open-World Bounded Autonomy Breadth)`.
|
||||
- Implementation breadth: `~99% (Open-World Bounded Autonomy Breadth through Slice 25)`.
|
||||
- Next active slice: `Open-World Semantic Control Gate`, covering garbage-anchor protection, business-overview continuation, intent dominance, frame hygiene, counterparty/organization arbitration, and final-summary answer shape.
|
||||
- Active module progress: `~93% (Open-World Bounded Autonomy Breadth, active slice: Semantic Control Gate)`.
|
||||
|
||||
## Reporting Rule
|
||||
|
||||
@@ -48,12 +63,16 @@ Use these labels when reporting progress:
|
||||
|
||||
- `Прогресс модуля: 99% (Post-F Semantic Integrity Hardening, operationally closed/regression gate)` when discussing the Post-F slice itself.
|
||||
- `Прогресс модуля: 100% (Planner Autonomy Consolidation, declared phase83 slice closed)` when discussing the planner-autonomy slice that was just completed.
|
||||
- `Прогресс модуля: X% (Open-World Bounded Autonomy Breadth, active slice: <name>)` for new breadth work after this point.
|
||||
- `Прогресс модуля: 93% (Open-World Bounded Autonomy Breadth, active slice: Semantic Control Gate)` while discussing current module closure after the EHMO manual replay.
|
||||
- `Open-World Business Overview implementation breadth: ~99%, semantic acceptance gate still open` when discussing only the already wired Slice 25 breadth.
|
||||
- `Прогресс модуля: X% (Open-World Bounded Autonomy Breadth, active slice: <name>)` for later breadth work after the Semantic Control Gate is accepted.
|
||||
|
||||
Do not report Post-F as `78%`, `87%`, or `92%`.
|
||||
|
||||
Do not report Planner Autonomy as still open unless the discussion is about the next broader module, not the declared phase83 closure target.
|
||||
|
||||
Do not report Open-World as simply `99% closed` until the EHMO-derived semantic control gate passes replay review.
|
||||
|
||||
## What Is Actually Closed
|
||||
|
||||
Post-F closed the acute semantic-integrity rescue layer:
|
||||
@@ -77,6 +96,7 @@ The project is not yet a universal arbitrary-1C agent.
|
||||
|
||||
Remaining work belongs to the next breadth module:
|
||||
|
||||
- close the `Open-World Semantic Control Gate` opened by `assistant-stage1-EHMOy3lNFt`;
|
||||
- extend `business_overview` beyond money-flow/activity, customer and supplier concentration, document/account-section activity mix, counterparty role split, contract usage, yearly operating-flow dynamics, explicit profit/margin wording boundaries, explicit debt due-date wording boundaries, explicit inventory reserve/liquidation wording boundaries, explicit supplier/procurement-quality wording boundaries, explicit-period VAT/tax, as-of-date debt position, open-settlement concentration, contract-date debt age, debt staleness-risk proxy, as-of-date inventory position, trading-margin proxy, sales-to-stock inventory proxy, warehouse staleness-risk proxy, and the missing-proof ledger into separately proven exact accounting profit/margin, due-date debt aging/overdue, confirmed vendor-risk/procurement-quality analysis, and confirmed reserve/write-off/liquidation inventory evidence families;
|
||||
- broader dynamic schema traversal for unfamiliar 1C asks;
|
||||
- more primitive descriptors where live evidence proves a real gap;
|
||||
@@ -98,10 +118,11 @@ For current planning, read:
|
||||
|
||||
1. `README.md`
|
||||
2. this document
|
||||
3. `22 - open_world_bounded_autonomy_breadth_2026-05-01.md`
|
||||
4. `20 - planner_autonomy_consolidation_2026-05-01.md`
|
||||
5. `19 - inventory_stock_open_world_breadth_proof_2026-05-01.md`
|
||||
6. `17 - post_f_semantic_integrity_hardening_2026-04-23.md`
|
||||
7. `16 - data_need_graph_and_open_world_mcp_plan_2026-04-22.md`
|
||||
3. `23 - current_execution_spine_and_semantic_control_gate_2026-05-05.md`
|
||||
4. `22 - open_world_bounded_autonomy_breadth_2026-05-01.md`
|
||||
5. `20 - planner_autonomy_consolidation_2026-05-01.md`
|
||||
6. `19 - inventory_stock_open_world_breadth_proof_2026-05-01.md`
|
||||
7. `17 - post_f_semantic_integrity_hardening_2026-04-23.md`
|
||||
8. `16 - data_need_graph_and_open_world_mcp_plan_2026-04-22.md`
|
||||
|
||||
Documents `01` through `15` remain valuable, but mostly as the historical architecture trail.
|
||||
|
||||
+53
@@ -728,3 +728,56 @@ Local validation is accepted for this slice:
|
||||
- `npm.cmd run build`: passed.
|
||||
|
||||
Graphify rebuild after Slice 25 code/doc sync: `6070 nodes`, `13233 edges`, `135 communities`.
|
||||
|
||||
## Slice 26 - Open-World Semantic Control Gate
|
||||
|
||||
This slice is opened by the manual GUI replay `assistant-stage1-EHMOy3lNFt`.
|
||||
|
||||
Slice 25 made the business overview broad and evidence-aware. EHMO then proved that breadth alone is not enough: in a long mixed human conversation, the assistant can still answer from the wrong semantic frame even when many individual routes are implemented.
|
||||
|
||||
This is a control-gate slice, not a new proof-family expansion.
|
||||
|
||||
The replay showed that exact canaries still work in several places, including VAT continuity, selected-item inventory/provenance, open-scope value-flow, and SVK-grounded chains. The failures are concentrated around semantic control:
|
||||
|
||||
- pseudo-entities and garbage anchors can be grounded from phrases like "by these data", "for", "overall", or generic follow-up nouns;
|
||||
- business-overview follow-ups can fall into generic living-chat help or stale memory recap instead of bounded analyst synthesis;
|
||||
- explicit VAT wording can lose to unrelated inventory wording when the word "position" is present;
|
||||
- explicit date switches can be ignored by stale selected-object or period carryover;
|
||||
- counterparty pivots can mix organization totals and counterparty totals;
|
||||
- metadata, field, and final-summary questions can be hijacked by stale exact lanes;
|
||||
- user-facing answers can be underpowered, generic, or shaped like internal capability help instead of business analysis.
|
||||
|
||||
The active work for this slice is:
|
||||
|
||||
1. entity and anchor hygiene;
|
||||
2. business overview continuation and synthesis;
|
||||
3. intent dominance and wrong-lane prevention;
|
||||
4. frame reset and stale carryover policy;
|
||||
5. counterparty/organization arbitration after pivots;
|
||||
6. final-summary answer lane and answer-shape control.
|
||||
|
||||
Acceptance for this slice requires the EHMO-derived critical subset to be rerun and semantically reviewed before the fat manual GUI pack is treated as accepted.
|
||||
|
||||
Suggested first subset:
|
||||
|
||||
- `003`
|
||||
- `005`
|
||||
- `008`
|
||||
- `013`
|
||||
- `020`
|
||||
- `021`
|
||||
- `022`
|
||||
- `023`
|
||||
- `024`
|
||||
- `039`
|
||||
- `040`
|
||||
- `041`
|
||||
- `046`
|
||||
- `056`
|
||||
- `061`
|
||||
|
||||
Current status:
|
||||
|
||||
- implementation breadth through Slice 25: `~99%`;
|
||||
- accepted Open-World module progress after EHMO: `~93%`;
|
||||
- exact P&L, real due-date debt aging, reserve/write-off/liquidation evidence, and vendor-risk engines stay queued behind this semantic gate.
|
||||
|
||||
+157
@@ -0,0 +1,157 @@
|
||||
# 23 - Current Execution Spine And Semantic Control Gate (2026-05-05)
|
||||
|
||||
## Purpose
|
||||
|
||||
This note is the current planning spine after the large manual GUI replay `assistant-stage1-EHMOy3lNFt`.
|
||||
|
||||
It exists because several valid plans are now layered on top of each other:
|
||||
|
||||
- Post-F semantic integrity hardening;
|
||||
- planner autonomy and catalog alignment;
|
||||
- open-world bounded autonomy breadth;
|
||||
- business overview evidence fusion;
|
||||
- manual QA pressure from complex human-style conversations.
|
||||
|
||||
The goal of this document is to keep one shared answer to four questions:
|
||||
|
||||
- what the final product direction is;
|
||||
- what is actually closed;
|
||||
- what the latest replay changed;
|
||||
- what must happen next before the current module can be called accepted.
|
||||
|
||||
## Final Product Direction
|
||||
|
||||
The target is not a hardcoded 1C connector and not a pile of one-off route fixes.
|
||||
|
||||
The target is a bounded MCP-first 1C analyst assistant where:
|
||||
|
||||
- the neural layer understands the user's business need;
|
||||
- the data-need graph maps that need into candidate evidence families;
|
||||
- the MCP catalog and route fabric expose reviewed traversal options;
|
||||
- the planner chooses among reviewed routes instead of relying on hardcoded prompt glue;
|
||||
- dynamic schema traversal grows the reachable surface when evidence is safely discoverable;
|
||||
- truth gates prevent the assistant from presenting proxy or inferred evidence as confirmed accounting fact;
|
||||
- follow-up context keeps the right organization, counterparty, period, selected object, and lane without stale contamination.
|
||||
|
||||
In short: the LLM should behave like a bounded analyst brain over MCP routes, not like a free-form chatbot and not like a deterministic paperclip.
|
||||
|
||||
## What Is Closed
|
||||
|
||||
The following blocks remain closed and should be used as regression gates:
|
||||
|
||||
- `Post-F Semantic Integrity Hardening`: operationally closed at `99%` as a hardening slice.
|
||||
- `Planner Autonomy Consolidation`: closed at `100%` for the declared phase83 planner-brain slice.
|
||||
- `Inventory Stock Open-World Breadth Proof`: closed at `100%` for the declared inventory-stock scenario pack.
|
||||
- `Open-World Business Overview` implementation breadth through Slice 25: implemented and locally/live validated for the declared fact families.
|
||||
|
||||
The important nuance is that implementation breadth and semantic acceptance are no longer the same number.
|
||||
|
||||
Before the EHMO manual replay, `~99%` was a fair implementation-breadth number for the active Open-World slice. After EHMO, it must not be reported as accepted closure. It means "most declared evidence families are wired"; it does not mean "human-style mixed dialogue is semantically clean under pressure."
|
||||
|
||||
## What EHMO Changed
|
||||
|
||||
The manual GUI replay `assistant-stage1-EHMOy3lNFt` did not invalidate the architecture.
|
||||
|
||||
It proved two things at the same time:
|
||||
|
||||
- many exact canaries and supported routes still work under a very aggressive mixed conversation;
|
||||
- the current assistant can still lose semantic control on complex human follow-ups, pseudo-anchors, intent arbitration, and final synthesis questions.
|
||||
|
||||
Therefore EHMO opens a new acceptance gate: `Open-World Semantic Control Gate`.
|
||||
|
||||
This gate is not a request to tune the assistant for every weird question in that replay. The replay is intentionally harsh and sometimes unrealistic. Its value is that it exposes systemic failure classes that normal users can still hit in milder wording.
|
||||
|
||||
## Current Status
|
||||
|
||||
Current status should be reported as:
|
||||
|
||||
- implementation breadth: `~99%` for Open-World Business Overview through Slice 25;
|
||||
- accepted module progress: `~93% (Open-World Bounded Autonomy Breadth, active slice: Semantic Control Gate)`.
|
||||
|
||||
This is not a regression from `99%` to `93%`. It is a metric split:
|
||||
|
||||
- `99%` describes wired breadth;
|
||||
- `93%` describes closure confidence after a broad human semantic replay found control-gate defects.
|
||||
|
||||
## Failure Classes To Fix
|
||||
|
||||
The next work must address classes, not individual questions:
|
||||
|
||||
- Garbage-anchor guard: never treat service words, interrogative tails, or generic nouns such as "documents", "for", "overall", "by these data" as newly grounded counterparties or selected objects.
|
||||
- Business-overview continuation guard: questions like "by these data", "can we say", "assemble an audit", "what is confirmed", "proxy", "profit", "margin", "liquidity", "overdue", or "risk" should continue the bounded overview/synthesis lane when an organization frame exists.
|
||||
- Intent dominance: explicit `VAT` must dominate inventory wording such as "position"; metadata/field questions must dominate stale exact document or value-flow lanes; paired debt questions must not collapse into a one-sided answer.
|
||||
- Frame hygiene: explicit topic switches should clear stale selected object and stale date scope while keeping the valid root organization when appropriate.
|
||||
- Counterparty-vs-organization separation: after grounding a counterparty such as SVK, totals and document/movement follow-ups must not masquerade organization totals as counterparty totals.
|
||||
- Final-summary lane: closing questions such as "so what do we know", "what is missing", or "what should we check next" should summarize confirmed/proxy/missing evidence without forcing a fresh wrong 1C lookup.
|
||||
- Answer-shape control: user-facing answers must not expose route ids, internal capability labels, or debug garbage, and must answer the business question before explaining boundaries.
|
||||
|
||||
## Do Not Do
|
||||
|
||||
Do not repair the current situation by:
|
||||
|
||||
- hardcoding all EHMO questions one by one;
|
||||
- broadening unsupported business claims just to make answers sound confident;
|
||||
- treating saved autorun questions as proof that an AGENT replay passed;
|
||||
- expanding into exact P&L, due-date aging, reserve/liquidation, or vendor-risk engines before the semantic control gate is stable;
|
||||
- hiding behind green unit tests when the human-readable answer is wrong.
|
||||
|
||||
## Next Work Units
|
||||
|
||||
The next implementation pass should be cut into these work units:
|
||||
|
||||
1. `Semantic Control Gate W1 - entity and anchor hygiene`
|
||||
2. `Semantic Control Gate W2 - business overview continuation and synthesis`
|
||||
3. `Semantic Control Gate W3 - intent dominance and wrong-lane prevention`
|
||||
4. `Semantic Control Gate W4 - frame reset and stale carryover policy`
|
||||
5. `Semantic Control Gate W5 - counterparty/organization arbitration after pivots`
|
||||
6. `Semantic Control Gate W6 - final-summary answer lane`
|
||||
|
||||
Each work unit should add focused local tests and then be validated against the EHMO-derived semantic subset.
|
||||
|
||||
## Acceptance Gate
|
||||
|
||||
The current module can move from `~93%` toward closure only after:
|
||||
|
||||
- the EHMO-derived critical subset is rerun and semantically reviewed;
|
||||
- old canaries remain green: Post-F, phase83, inventory selected-object, VAT continuity, SVK document/movement chains;
|
||||
- broad business overview still answers from confirmed/proxy/missing evidence rather than unsupported confidence;
|
||||
- no stale organization/counterparty/date/selected-object contamination appears in the reviewed subset;
|
||||
- no internal route/debug/capability garbage leaks into user-facing answers;
|
||||
- the full fat manual GUI pack is either clean enough for acceptance or the remaining defects are explicitly classified as outside the declared contour.
|
||||
|
||||
Suggested EHMO subset for the first hardening loop:
|
||||
|
||||
- `003`, `005`, `008`, `013`, `020`, `021`, `022`, `023`, `024`, `039`, `040`, `041`, `046`, `056`, `061`.
|
||||
|
||||
## Current Artifacts
|
||||
|
||||
Manual QA pack prepared for GUI:
|
||||
|
||||
- `docs/orchestration/manual_qa_open_world_breadth_99_fat_gui_pack_20260505.json`
|
||||
- saved autorun: `llm_normalizer/data/autorun_generators/saved_sessions/assistant_saved_session_20260505141816_gen-mq05051418-fat99.json`
|
||||
- eval case: `llm_normalizer/data/eval_cases/assistant_autogen_saved_user_sessions_20260505141816_gen-mq05051418-fat99.json`
|
||||
|
||||
Manual runtime run reviewed as the gate opener:
|
||||
|
||||
- run id: `assistant-stage1-EHMOy3lNFt`
|
||||
- runtime case set: `llm_normalizer/data/eval_cases/assistant_saved_session_runtime_job-eUovXbfqU0.json`
|
||||
- report: `llm_normalizer/reports/assistant-stage1-EHMOy3lNFt.md`
|
||||
- session: `llm_normalizer/data/assistant_sessions/assistant-stage1-EHMOy3lNFt-SAVED-001.json`
|
||||
|
||||
Graphify snapshot at this status cut:
|
||||
|
||||
- `6070 nodes`
|
||||
- `13233 edges`
|
||||
- `135 communities`
|
||||
|
||||
## Reporting Rule
|
||||
|
||||
Until the semantic control gate is accepted, use:
|
||||
|
||||
`Прогресс модуля: 93% (Open-World Bounded Autonomy Breadth, active slice: Semantic Control Gate)`
|
||||
|
||||
If discussing only the already wired business-overview breadth, say:
|
||||
|
||||
`Open-World Business Overview implementation breadth: ~99%, semantic acceptance gate still open`
|
||||
|
||||
Do not collapse those two statements into one number.
|
||||
@@ -40,6 +40,7 @@ This package answers the next question:
|
||||
20. [20 - planner_autonomy_consolidation_2026-05-01.md](./20%20-%20planner_autonomy_consolidation_2026-05-01.md)
|
||||
21. [21 - current_status_canon_2026-05-01.md](./21%20-%20current_status_canon_2026-05-01.md)
|
||||
22. [22 - open_world_bounded_autonomy_breadth_2026-05-01.md](./22%20-%20open_world_bounded_autonomy_breadth_2026-05-01.md)
|
||||
23. [23 - current_execution_spine_and_semantic_control_gate_2026-05-05.md](./23%20-%20current_execution_spine_and_semantic_control_gate_2026-05-05.md)
|
||||
|
||||
## Current Status Snapshot (2026-05-05)
|
||||
|
||||
@@ -74,8 +75,11 @@ Status canon for planning:
|
||||
- The current completed breadth slice is `Business Overview Document/Account Activity Profile Bridge`: business overview now executes the reviewed document-type/account-section profile and can surface confirmed operational activity mix without claiming process quality, accounting correctness, or full 1C coverage.
|
||||
- The current completed breadth slice is `Business Overview Counterparty/Contract Profile Bridge`: business overview now executes reviewed counterparty population/roles and contract usage profiles, while CRM quality, counterparty due diligence, legal completeness, and contract-risk remain unclaimed.
|
||||
- The current completed breadth slice is `Business Overview Missing Proof Ledger`: business overview now records hard remaining proof gaps as machine-readable `missing_proof_families`, separating proxy-only evidence from reviewed routes that are not wired yet.
|
||||
- The next active breadth slice continues breadth into exact company-wide accounting profit/margin, real due-date debt aging, confirmed reserve/write-off/liquidation inventory evidence, and broader unfamiliar 1C route families without relaxing truth boundaries.
|
||||
- The `assistant-stage1-EHMOy3lNFt` manual GUI replay opened the next acceptance gate: `Open-World Semantic Control Gate`.
|
||||
- The `~99%` Open-World number now means implementation breadth through Slice 25, not accepted semantic closure under broad human dialogue pressure.
|
||||
- The next active breadth slice is semantic control rather than new proof-family expansion: garbage-anchor protection, business-overview continuation, intent dominance, frame hygiene, counterparty/organization arbitration, and final-summary answer shape.
|
||||
- The short source of truth for status wording is [21 - current_status_canon_2026-05-01.md](./21%20-%20current_status_canon_2026-05-01.md).
|
||||
- The current execution spine after EHMO is [23 - current_execution_spine_and_semantic_control_gate_2026-05-05.md](./23%20-%20current_execution_spine_and_semantic_control_gate_2026-05-05.md).
|
||||
|
||||
It now documents a turnaround that is already operational in code, already materially past the acute regression breakpoint, and already moved through bounded MCP autonomy, Post-F hardening, inventory breadth proof, and the declared Planner Autonomy slice:
|
||||
|
||||
@@ -139,7 +143,8 @@ Current honest status:
|
||||
- pre-multidomain readiness: `~90%`
|
||||
- bounded-autonomy foundation readiness: `~89%`
|
||||
- open-world bounded-autonomy readiness: `~87%`
|
||||
- active Open-World Bounded Autonomy Breadth progress: `~99%`, with business-overview evidence fusion, the reviewed `business_overview` catalog/data-need/planner route-fabric slice, the fresh multi-probe runtime bridge, the explicit-period VAT/tax fact-family bridge, the explicit-period debt-position bridge, the explicit-date inventory-position bridge, the open-settlement quality bridge accepted by live semantic replay, selected-item profitability bridged by local semantic/runtime regression tests, contract-date debt age bridged locally, debt staleness-risk proxy bridged locally, debt due-date boundary arbitration bridged locally, inventory reserve/liquidation boundary arbitration bridged locally, supplier/procurement-quality boundary arbitration bridged locally, supplier concentration proxy bridged locally, document/account-section activity profile bridged locally, counterparty population/roles and contract usage profiles bridged locally, yearly operating-flow proxy bridged locally, earnings/best-year wording arbitration bridged locally, profit/margin wording boundary arbitration bridged locally, analyst synthesis added to business-overview answer drafting, company-period trading margin proxy bridged locally, inventory sales-to-stock proxy bridged locally, inventory staleness-risk proxy bridged locally, gap-specific answer shaping bridged locally, and missing proof families recorded as runtime evidence ledger; exact accounting profit/margin, true due-date debt aging/overdue, confirmed vendor-risk/procurement-quality analysis, and confirmed reserve/write-off/liquidation inventory evidence are still pending
|
||||
- active Open-World Bounded Autonomy Breadth implementation breadth: `~99%`, with business-overview evidence fusion, the reviewed `business_overview` catalog/data-need/planner route-fabric slice, the fresh multi-probe runtime bridge, the explicit-period VAT/tax fact-family bridge, the explicit-period debt-position bridge, the explicit-date inventory-position bridge, the open-settlement quality bridge accepted by live semantic replay, selected-item profitability bridged by local semantic/runtime regression tests, contract-date debt age bridged locally, debt staleness-risk proxy bridged locally, debt due-date boundary arbitration bridged locally, inventory reserve/liquidation boundary arbitration bridged locally, supplier/procurement-quality boundary arbitration bridged locally, supplier concentration proxy bridged locally, document/account-section activity profile bridged locally, counterparty population/roles and contract usage profiles bridged locally, yearly operating-flow proxy bridged locally, earnings/best-year wording arbitration bridged locally, profit/margin wording boundary arbitration bridged locally, analyst synthesis added to business-overview answer drafting, company-period trading margin proxy bridged locally, inventory sales-to-stock proxy bridged locally, inventory staleness-risk proxy bridged locally, gap-specific answer shaping bridged locally, and missing proof families recorded as runtime evidence ledger; exact accounting profit/margin, true due-date debt aging/overdue, confirmed vendor-risk/procurement-quality analysis, and confirmed reserve/write-off/liquidation inventory evidence are still pending
|
||||
- active Open-World Bounded Autonomy Breadth accepted-module progress: `~93%`, because the EHMO manual GUI replay opened the `Open-World Semantic Control Gate` before closure
|
||||
- Post-F semantic integrity module progress: `~99%` operationally closed, with remaining risk now treated as next-slice discovery rather than an open blocker inside the closed slice
|
||||
- active inventory-stock breadth slice progress: `100%` for the declared scenario pack, not for arbitrary inventory questions
|
||||
- Planner Autonomy Consolidation progress: `100%` for the declared module, with catalog-fabric, value-flow arbitration, lifecycle bounded inference, broad-evaluation bridge, inventory catalog templates, inventory runtime-boundary honesty, exact inventory recipe bridging, unambiguous metadata-surface lane inference, catalog chain-template scoring, structured chain-match contract exposure, runtime/debug propagation, subject-aware bidirectional comparison arbitration, structured catalog-alignment verdicts, representative alignment regression guard, catalog-alignment reason-code telemetry, explicit `alignment_status` propagation, truth-harness/acceptance-matrix surfacing, soft divergence warning, `catalog_alignment_ok` acceptance invariant, step-level expected catalog-alignment assertions, phase66 and phase32 spec alignment expectations, AGENT source-catalog surfacing, generated phase83 mixed planner-brain replay spec, checked-source user-facing error sanitation, surface-grounded catalog promotion, and guarded live phase83 acceptance validated. Broader unfamiliar 1C asks are now next-module breadth work rather than an open blocker inside this declared slice
|
||||
|
||||
Reference in New Issue
Block a user