Integrate layer notes, project views and resilient BIM uploads

This commit is contained in:
DCCONSTRUCTIONS
2026-11-16 00:40:03 +03:00
parent 8aeb5b3fd2
commit 0f97f79216
9 changed files with 76 additions and 30 deletions
+47 -1
View File
@@ -1,5 +1,51 @@
# Portable BIM module in Mission Core
## Current delivery · 16 November 2026
Portable client **0.2.31**, host and single BIM Worker **0.2.12**. The current
release identities and artifact hashes are in `vendor/bim/*release.json`.
The sections below are dated earlier qualifications, not the current package pins.
Each material root in Hierarchy opens its own dockable Notes window. Notes have
list/tiles views, prepared thumbnails, same-version photo navigation, a separate
camera-view action, editing and deletion. File/storage actions remain with the
material in Hierarchy; active/error transfers use a separate temporary Uploads
window. Original photos remain on Worker; display/thumbnail WebP and the bounded
Core preview cache are unchanged. No new photos were admitted.
Each project owns a durable `project-views/<id>/meta.json`: camera, projection,
loaded/hidden layers, viewport preferences and docked/floating windows. KU Leuven
→ another project → KU Leuven preserved every viewer field exactly. Concurrent
conflicting edits showed a visible conflict and retained the newer document.
Project roots now have full-deletion confirmation and a durable retirement
outbox. Worker confirmation and local cleanup precede removal of the row;
shared data is retained for remaining owners. Only open/cancel was exercised
live; destructive/restart paths were covered with synthetic regression cases.
Interrupted chunk transfers reappear after reload. Reselecting a matching file
checks its full SHA-256 and resumes its acknowledged Worker offset without a
new version. No original file is cached on Core. Transient failures reconcile
Worker acknowledgement before bounded retries. SSH cleanup cannot leak a
capacity slot, and photo preview concurrency leaves capacity for source uploads.
Browser restart still requires file reselection; autonomous access to an old
File handle is not claimed. See the module's `docs/upload-recovery.md`.
Large-file acceptance: the Sadovaya LAS (7,448,522,823 bytes) resumed the existing
2 GiB partial upload after exact reselection, retained all 219,074,194 points,
and produced 1,944,796,856 bytes of ready Potree data. The complete product was
verified in Core and rendered in the viewport, including a fresh-page reopening
regression. Worker retains the source; staging and job scratch are empty.
The accepted source SHA-256 and conversion details are in the module's upload
recovery document. Native multi-GB intake across arbitrary browser termination
still requires reselecting the file; a disconnected browser cannot read it alone.
Validation: 106 module client, 161 module server, 2 Core adapter and 1608 Core
frontend tests passed; architecture, typography, types and production build
passed. Live notes list/tiles, gallery next/previous, keyboard and Escape passed.
IAB rejected native fullscreen, so that action is not newly accepted here.
Complete multiuser authorization and physical power-loss qualification remain open.
## LAS normalization correction · 15 November 2026
@@ -13,7 +59,7 @@ source upload, duplicate material or Core restart was needed.
## Notes and photo fixes · 15 November 2026
Current notes delivery is portable client 0.2.27 / host and single BIM Worker
The preceding notes delivery used portable client 0.2.27 / host and single BIM Worker
0.2.9, from module source `60b88af9e84496191451819dd3ef19e9ec9b1c81`.
The Layers panel owns text/photo/camera notes beneath each material version.
Worker retains immutable originals and prepares bounded WebP images; Core keeps