docs(architecture): prioritize RAVNOVES00 maturation
This commit is contained in:
@@ -2,7 +2,11 @@
|
||||
|
||||
Date: 2026-07-27
|
||||
|
||||
Status: accepted; transfer replay blocked by missing source provenance
|
||||
Status: accepted audit; transfer priority deferred by ADR 0030
|
||||
|
||||
Program update: ADR 0030 makes RAVNOVES00 reference-source maturation the
|
||||
current critical path. This audit remains immutable planning evidence for a
|
||||
later transfer cycle; TEST007 and E36 are not current product blockers.
|
||||
|
||||
## Context
|
||||
|
||||
@@ -58,9 +62,10 @@ contain the required camera modality or accepted physical-source provenance.
|
||||
|
||||
- A9 has completed its catalog-admission sub-gate, but E36 transfer remains
|
||||
blocked.
|
||||
- The next admissible action is provenance recovery or a new explicit binding
|
||||
artifact for TEST007, based only on primary evidence. It is not threshold
|
||||
tuning and does not rerun E32–E35.
|
||||
- When ADR 0030 later reactivates transfer work, the admissible action is
|
||||
provenance recovery or a new explicit binding artifact for TEST007, based
|
||||
only on primary evidence. It is not threshold tuning and does not rerun
|
||||
E32–E35.
|
||||
- If both bindings become available, the same audit can be rerun. Only an
|
||||
eligible result authorizes packaging the frozen E32–E35 transfer replay.
|
||||
- Until then, Mission Core publishes no LAB E36 page and claims no
|
||||
|
||||
@@ -0,0 +1,78 @@
|
||||
# ADR 0030 — RAVNOVES00 reference-source maturation before transfer
|
||||
|
||||
Date: 2026-07-27
|
||||
|
||||
Status: accepted
|
||||
|
||||
## Context
|
||||
|
||||
Mission Core has completed A0–A8 on the immutable RAVNOVES00 source and has a
|
||||
source-catalog audit for the later E36 transfer gate. The immediate product
|
||||
objective is not open-world autonomy or cross-route generalization. It is a
|
||||
bounded near-industrial transport product operating at low speed in a known
|
||||
location on known routes, with simple tasks such as movement from point A to
|
||||
point B.
|
||||
|
||||
Attempting second-source transfer now would split effort before the
|
||||
source-scoped perception architecture, evidence workflow and operator product
|
||||
have reached a useful quality level. A new route and another camera view can be
|
||||
recorded later, after the current reference path is stable enough to make that
|
||||
transfer test meaningful.
|
||||
|
||||
## Decision
|
||||
|
||||
1. RAVNOVES00 is the only active physical reference source for the current
|
||||
product-maturation cycle.
|
||||
2. E36 and TEST007 are deferred. The existing E36 catalog audit remains valid
|
||||
historical planning evidence, but transfer is no longer the current
|
||||
critical-path gate.
|
||||
3. No new physical route or camera capture is required until RAVNOVES00 reaches
|
||||
the source-scoped product acceptance defined below.
|
||||
4. All changes remain append-only immutable LAB results over the same
|
||||
RAVNOVES00 source. Accepted generations are never rewritten.
|
||||
5. The next gate must define and freeze a reviewed development/validation split
|
||||
inside RAVNOVES00 before any new quality tuning.
|
||||
6. The target is at least `90%` on each task-relevant validation dimension:
|
||||
object-versus-background decision correctness, camera↔geometry association
|
||||
correctness and current-versus-stale state correctness.
|
||||
7. The `90%` target is source-scoped. It is not a claim of universal detector
|
||||
accuracy, cross-site generalization, safety certification or open-world
|
||||
autonomy.
|
||||
8. Average quality cannot waive hard invariants: source accounting remains
|
||||
complete, missing evidence remains unknown, false free-space claims remain
|
||||
forbidden and degraded input must fail visibly.
|
||||
9. The same reference cycle may extend reusable product controls, evidence
|
||||
viewers, LAB templates and comparison workflows under the existing Design
|
||||
Guideline and component architecture canons.
|
||||
10. A second capture becomes the transfer gate only after the source-scoped
|
||||
release candidate is accepted and the operator explicitly authorizes new
|
||||
collection.
|
||||
|
||||
## Product envelope
|
||||
|
||||
The current product assumption is intentionally bounded:
|
||||
|
||||
- known or pre-mapped industrial location;
|
||||
- declared routes and simple logistics missions;
|
||||
- low-speed motion and conservative stopping on uncertainty;
|
||||
- no adversarial environment, tactical autonomy or strategic replanning;
|
||||
- no implication that a `90%` perception score alone authorizes actuation.
|
||||
|
||||
This narrower envelope reduces unnecessary complexity, but it does not remove
|
||||
the requirement for explicit unknown/stale states, watchdogs, command expiry or
|
||||
independent physical safety controls.
|
||||
|
||||
## Consequences
|
||||
|
||||
- The active critical path moves from E36 transfer to RAVNOVES00
|
||||
reference-source quality and product closure.
|
||||
- The immediate next experiment is a source-scoped acceptance-contract LAB,
|
||||
not another data collection or another transfer audit.
|
||||
- Future quality iterations may change algorithms, models and thresholds only
|
||||
through new immutable profiles and results evaluated against the frozen
|
||||
validation split.
|
||||
- Product UI work is justified when it exposes a reusable task, method,
|
||||
evidence, result or comparison contract. Run-specific decorative or
|
||||
temporary interfaces remain forbidden.
|
||||
- Generalization remains explicitly unproved until a later independently
|
||||
recorded source is admitted and replayed.
|
||||