docs(architecture): prioritize RAVNOVES00 maturation
This commit is contained in:
@@ -7,7 +7,8 @@ local-surface temporal qualification, operator triage and prior-plane residual
|
|||||||
explainability implemented; L2.6e recorded-source-paced bounded shadow
|
explainability implemented; L2.6e recorded-source-paced bounded shadow
|
||||||
qualified; E28 complete worker replay accepted; E29 camera-first semantic and
|
qualified; E28 complete worker replay accepted; E29 camera-first semantic and
|
||||||
parallel geometry-only replay implemented; E30–E35 source-scoped qualification
|
parallel geometry-only replay implemented; E30–E35 source-scoped qualification
|
||||||
accepted; E36 transfer gate next
|
accepted; RAVNOVES00 reference-source product maturation active; E36 transfer
|
||||||
|
deferred by ADR 0030
|
||||||
Scope: passively received real-time K1 point/pose evidence, immutable replay and
|
Scope: passively received real-time K1 point/pose evidence, immutable replay and
|
||||||
future live shadow processing
|
future live shadow processing
|
||||||
Explicitly out of scope: K1 firmware modification, a new onboard exporter, new
|
Explicitly out of scope: K1 firmware modification, a new onboard exporter, new
|
||||||
@@ -647,9 +648,12 @@ The E36 catalog-admission audit is complete in immutable result
|
|||||||
`e36-source-catalog-audit-c5a7b259f043c0a4f3be38f869af1e675dfaa43743e45fd4f43fac166d07f849`.
|
`e36-source-catalog-audit-c5a7b259f043c0a4f3be38f869af1e675dfaa43743e45fd4f43fac166d07f849`.
|
||||||
TEST007 passes the camera, LiDAR, pose, host-time, device-identity and minimum
|
TEST007 passes the camera, LiDAR, pose, host-time, device-identity and minimum
|
||||||
camera-window checks, but lacks calibration and physical-mount identities bound
|
camera-window checks, but lacks calibration and physical-mount identities bound
|
||||||
to its source session. The transfer replay remains blocked; no LAB E36 page,
|
to its source session under that audit profile. The transfer replay was not
|
||||||
retuning or automatic collection was created. ADR 0029 records the admission
|
created. ADR 0030 subsequently deferred TEST007 and E36 as current priorities:
|
||||||
contract and exact unblocking evidence.
|
RAVNOVES00 source-scoped quality, product workflow and a reference release
|
||||||
|
candidate now come first. No new capture is required or authorized by default.
|
||||||
|
The active gates are defined in
|
||||||
|
`docs/20_RAVNOVES00_REFERENCE_SOURCE_PRODUCT_PLAN.md`.
|
||||||
|
|
||||||
The current E30 AI-assisted engineering generation is
|
The current E30 AI-assisted engineering generation is
|
||||||
`e30-engineering-generation-62a4fea10dea9b77f69ceac1af5bf0e4928d9c7716083c22258a03670fe5bd4f`.
|
`e30-engineering-generation-62a4fea10dea9b77f69ceac1af5bf0e4928d9c7716083c22258a03670fe5bd4f`.
|
||||||
|
|||||||
@@ -24,6 +24,24 @@ consumer must request an explicit catalog scope:
|
|||||||
Deleting, renaming or moving source payloads to make the UI look clean is
|
Deleting, renaming or moving source payloads to make the UI look clean is
|
||||||
forbidden. Product separation is expressed by typed projections.
|
forbidden. Product separation is expressed by typed projections.
|
||||||
|
|
||||||
|
## Current reference-source policy
|
||||||
|
|
||||||
|
RAVNOVES00 is the sole active physical reference source for the current
|
||||||
|
product-maturation cycle defined by ADR 0030. Until its source-scoped release
|
||||||
|
candidate is accepted:
|
||||||
|
|
||||||
|
- new perception and product iterations use RAVNOVES00;
|
||||||
|
- each iteration creates a new immutable LAB and never rewrites an older one;
|
||||||
|
- TEST007, E36 and new physical collection are deferred, not required gates;
|
||||||
|
- no agent may initiate or imply a new capture without explicit operator
|
||||||
|
authorization;
|
||||||
|
- the active quality target is at least `90%` on each frozen task-level
|
||||||
|
validation dimension, never one unqualified aggregate accuracy number.
|
||||||
|
|
||||||
|
This policy is a development priority, not a universality claim. Later
|
||||||
|
second-source transfer remains required before any cross-route or cross-camera
|
||||||
|
generalization statement.
|
||||||
|
|
||||||
## Immutable identity
|
## Immutable identity
|
||||||
|
|
||||||
Every LAB run is one append-only result with:
|
Every LAB run is one append-only result with:
|
||||||
|
|||||||
@@ -32,16 +32,38 @@ generation, the Polygon SRS or any authority boundary.
|
|||||||
| A6 — E32 full replay | Camera-first geometry v2 over all 4,489 source frames | A4–A5 | E29/E32 comparison by cause, class, range and scene; no hidden source loss or false free space |
|
| A6 — E32 full replay | Camera-first geometry v2 over all 4,489 source frames | A4–A5 | E29/E32 comparison by cause, class, range and scene; no hidden source loss or false free space |
|
||||||
| A7 — E33 worker shadow | Persistent recorded-source-paced execution with channel-specific deadlines and resource telemetry | A6 | Closed queue/drop/recovery accounting; diagnostic/shadow only |
|
| A7 — E33 worker shadow | Persistent recorded-source-paced execution with channel-specific deadlines and resource telemetry | A6 | Closed queue/drop/recovery accounting; diagnostic/shadow only |
|
||||||
| A8 — E34/E35 local model | Short-TTL occupied/unknown layers and deterministic degradation suite | A7 | Explicit current/held/unknown aging and safe degradation; planner authority remains false |
|
| A8 — E34/E35 local model | Short-TTL occupied/unknown layers and deterministic degradation suite | A7 | Explicit current/held/unknown aging and safe degradation; planner authority remains false |
|
||||||
| A9 — E36 transfer | Frozen-profile replay on a mounted second real source | A8 and eligible source | Generalization decision without retuning; blocked if no eligible source exists |
|
| A9 — E36 transfer | Frozen-profile replay on a mounted second real source | Accepted RAVNOVES00 reference release candidate and later eligible source | Generalization decision without retuning; deferred by ADR 0030 |
|
||||||
|
|
||||||
The strict critical path is:
|
The completed source-contract path is:
|
||||||
|
|
||||||
```text
|
```text
|
||||||
A0 → A1 → A2 → A3 → A4 → A5 → A6 → A7 → A8 → A9
|
A0 → A1 → A2 → A3 → A4 → A5 → A6 → A7 → A8
|
||||||
```
|
```
|
||||||
|
|
||||||
A5 contract design may start before E31 closes, but the accepted E31
|
A5 contract design may start before E31 closes, but the accepted E31
|
||||||
time/calibration/mount identities must be bindable before E32 publication.
|
time/calibration/mount identities must be bindable before E32 publication.
|
||||||
|
A9 remains a later generalization gate. It is no longer the current product
|
||||||
|
critical path.
|
||||||
|
|
||||||
|
## Workstream R — RAVNOVES00 reference-source maturation
|
||||||
|
|
||||||
|
ADR 0030 makes this the active path before A9:
|
||||||
|
|
||||||
|
```text
|
||||||
|
R0 acceptance contract
|
||||||
|
→ R1 perception quality
|
||||||
|
→ R2 temporal product state
|
||||||
|
→ R3 product workflow
|
||||||
|
→ R4 reference release candidate
|
||||||
|
→ R5 later transfer
|
||||||
|
```
|
||||||
|
|
||||||
|
R0–R4 use only immutable RAVNOVES00 evidence. The target is `>= 90%`
|
||||||
|
separately for reviewed object/background decisions, camera↔geometry
|
||||||
|
association and current/stale decisions, plus complete accounting and zero
|
||||||
|
false-free claims. R5 is a later operator-authorized capture and transfer
|
||||||
|
cycle. The detailed gate is
|
||||||
|
`docs/20_RAVNOVES00_REFERENCE_SOURCE_PRODUCT_PLAN.md`.
|
||||||
|
|
||||||
## Workstream B — Simulation Polygon
|
## Workstream B — Simulation Polygon
|
||||||
|
|
||||||
@@ -208,14 +230,15 @@ Six deterministic variants each replay all 4,489 frames; the result records
|
|||||||
26,934 terminal outcomes and 360 injections. Maximum recovery is `0.102 s`
|
26,934 terminal outcomes and 360 injections. Maximum recovery is `0.102 s`
|
||||||
against the `0.25 s` gate. Hidden success, false free-space, unsupported
|
against the `0.25 s` gate. Hidden success, false free-space, unsupported
|
||||||
semantic/metric claims, timing-mismatch `agree`, late-result return and
|
semantic/metric claims, timing-mismatch `agree`, late-result return and
|
||||||
upstream changes are all zero. A0–A8 are closed. A9/E36 is now the critical
|
upstream changes are all zero. A0–A8 are closed. At the time A8 closed, A9/E36
|
||||||
path. Its immutable catalog-admission audit
|
was the next architecture gate. Its immutable catalog-admission audit
|
||||||
`e36-source-catalog-audit-c5a7b259f043c0a4f3be38f869af1e675dfaa43743e45fd4f43fac166d07f849`
|
`e36-source-catalog-audit-c5a7b259f043c0a4f3be38f869af1e675dfaa43743e45fd4f43fac166d07f849`
|
||||||
checked all 11 physical source rows. TEST007 is a real 206.073-second candidate
|
checked all 11 physical source rows. TEST007 is a real 206.073-second candidate
|
||||||
with camera, LiDAR, pose, host time and device identity, but no calibration or
|
with camera, LiDAR, pose, host time and device identity, but no calibration or
|
||||||
mount identity is bound to that source session. A9 transfer therefore remains
|
mount identity is bound to that source session. A9 transfer therefore remains
|
||||||
blocked without publishing an empty LAB. ADR 0029 defines the exact unblocking
|
unexecuted without publishing an empty LAB. ADR 0029 retains the audit.
|
||||||
contract.
|
ADR 0030 now defers TEST007/E36 and makes RAVNOVES00 source-scoped quality and
|
||||||
|
product closure the active critical path.
|
||||||
|
|
||||||
- [x] Reproduce all 4,489 immutable E29 frames with the exact frozen profile
|
- [x] Reproduce all 4,489 immutable E29 frames with the exact frozen profile
|
||||||
before applying E31/E30 changes.
|
before applying E31/E30 changes.
|
||||||
@@ -231,10 +254,15 @@ contract.
|
|||||||
E33 worker input with complete artifact digests.
|
E33 worker input with complete artifact digests.
|
||||||
- [x] Audit all 11 physical source rows through the frozen E36 eligibility
|
- [x] Audit all 11 physical source rows through the frozen E36 eligibility
|
||||||
contract without creating an empty LAB.
|
contract without creating an empty LAB.
|
||||||
- [ ] Bind TEST007 calibration and physical mount identities to its exact
|
- [x] Defer TEST007, E36 and new collection until the RAVNOVES00 reference
|
||||||
source session using primary evidence.
|
release candidate is accepted.
|
||||||
- [ ] Run and compare the frozen E32–E35 profile on an eligible second source
|
- [ ] Freeze the RAVNOVES00 task ontology, reviewed denominator and
|
||||||
without retuning.
|
development/validation split.
|
||||||
|
- [ ] Reach `>= 90%` separately for presence, geometry association and
|
||||||
|
freshness decisions while retaining complete accounting and zero false-free
|
||||||
|
claims.
|
||||||
|
- [ ] Complete the reusable product workflow and source-scoped reference
|
||||||
|
release candidate before returning to second-source transfer.
|
||||||
- [x] Replay all 4,489 frames at recorded `1.0×` pace through independent
|
- [x] Replay all 4,489 frames at recorded `1.0×` pace through independent
|
||||||
bounded latest-wins work/result queues.
|
bounded latest-wins work/result queues.
|
||||||
- [x] Close every frame as delivered, input-superseded or result-superseded
|
- [x] Close every frame as delivered, input-superseded or result-superseded
|
||||||
|
|||||||
@@ -0,0 +1,90 @@
|
|||||||
|
# RAVNOVES00 reference-source product plan
|
||||||
|
|
||||||
|
Date: 2026-07-27
|
||||||
|
|
||||||
|
Status: active
|
||||||
|
|
||||||
|
ADR 0030 makes RAVNOVES00 the sole physical reference source for the current
|
||||||
|
Mission Core product-maturation cycle. This plan turns that decision into
|
||||||
|
bounded gates. It does not claim cross-route generalization or authorize
|
||||||
|
commands, navigation or safety.
|
||||||
|
|
||||||
|
## Product objective
|
||||||
|
|
||||||
|
Build a readable, reproducible and operationally conservative perception
|
||||||
|
product for a known near-industrial location and simple low-speed transport
|
||||||
|
missions. Mission Core should answer:
|
||||||
|
|
||||||
|
- what the camera observes;
|
||||||
|
- which current LiDAR evidence belongs to that observation;
|
||||||
|
- whether the evidence is current, held, stale, conflicting or unavailable;
|
||||||
|
- what changed between two immutable methods;
|
||||||
|
- why a result passed, failed or remained uncertain.
|
||||||
|
|
||||||
|
The product is not being designed for adversarial, tactical or continuously
|
||||||
|
novel environments.
|
||||||
|
|
||||||
|
## Acceptance meaning
|
||||||
|
|
||||||
|
`90%` is a target for reviewed task-level correctness on RAVNOVES00, not a
|
||||||
|
generic marketing accuracy score.
|
||||||
|
|
||||||
|
The next acceptance contract must freeze a validation set before further
|
||||||
|
tuning and measure at least:
|
||||||
|
|
||||||
|
| Dimension | Question | Source-scoped target |
|
||||||
|
| --- | --- | ---: |
|
||||||
|
| Presence decision | Is the task-relevant object/obstacle real rather than background or detector noise? | `>= 90%` |
|
||||||
|
| Geometry association | Are the admitted current points attached to the correct observation or independent occupied component? | `>= 90%` |
|
||||||
|
| Freshness decision | Is current, held, stale or unavailable state represented correctly? | `>= 90%` |
|
||||||
|
| Evidence accounting | Does every admitted source item receive an explicit terminal outcome? | `100%` |
|
||||||
|
| False free space | Does missing or rejected evidence ever become asserted free space? | `0` |
|
||||||
|
|
||||||
|
Targets apply separately. A strong presence score cannot compensate for bad
|
||||||
|
geometry association or hidden stale evidence.
|
||||||
|
|
||||||
|
The reviewed denominator, sampling strata and severity classes must be frozen
|
||||||
|
before the next tuning cycle. Development items may be used for diagnosis and
|
||||||
|
changes; sealed validation items may only be used for evaluation. High-impact
|
||||||
|
failures remain blocking even when an aggregate percentage passes.
|
||||||
|
|
||||||
|
## Current path
|
||||||
|
|
||||||
|
| Gate | Deliverable | Exit |
|
||||||
|
| --- | --- | --- |
|
||||||
|
| R0 — acceptance contract | Freeze task ontology, reviewed denominator, development/validation split, metrics, severity and error budget over RAVNOVES00 | Reproducible evaluation with no post-result denominator changes |
|
||||||
|
| R1 — perception quality | Iterate detector, camera↔geometry association, source-time handling and conservative corrections as new immutable LABs | Each task-level validation dimension reaches `>= 90%` or has an explicit bounded exception |
|
||||||
|
| R2 — temporal product state | Refine current/held/stale/unknown presentation and bounded occupied telemetry without polluting the persistent reconstruction | Stable task-relevant state, closed accounting and deterministic degradation |
|
||||||
|
| R3 — product workflow | Complete reusable source/LAB selection, method summary, visual evidence, comparison, controls and conclusion templates | A non-expert can understand the run; an engineer can inspect exact provenance and metrics |
|
||||||
|
| R4 — reference release candidate | Replay the complete RAVNOVES00 source through the accepted pipeline at recorded pace with regression, resource and recovery evidence | Source-scoped release decision for the known-location product envelope |
|
||||||
|
| R5 — later transfer | Record a new route/camera only after explicit operator authorization and run the frozen release candidate unchanged | Generalization decision; no retuning before comparison |
|
||||||
|
|
||||||
|
R0–R4 are the active path. R5 is intentionally deferred.
|
||||||
|
|
||||||
|
## Experiment rules
|
||||||
|
|
||||||
|
1. RAVNOVES00 remains immutable and is never relabelled as a LAB result.
|
||||||
|
2. Every iteration creates a new LAB identity, method profile and conclusion.
|
||||||
|
3. Existing E29–E35 results remain historical evidence and are not overwritten.
|
||||||
|
4. Metrics are computed from server-owned artifacts; the UI does not invent
|
||||||
|
acceptance state.
|
||||||
|
5. The compact LAB summary explains the task, method, relevant models,
|
||||||
|
algorithms, result and limitation. The full engineering report is recorded
|
||||||
|
in Ops and the repository report.
|
||||||
|
6. New product controls must use the accepted component and Design Guideline
|
||||||
|
systems. A new component or page anatomy requires explicit agreement.
|
||||||
|
7. No run claims universal accuracy, planner fitness, navigation or safety
|
||||||
|
acceptance merely because its source-scoped target passes.
|
||||||
|
|
||||||
|
## Deferred work
|
||||||
|
|
||||||
|
Until R4 closes, the following are not current blockers:
|
||||||
|
|
||||||
|
- TEST007 qualification;
|
||||||
|
- E36 second-source transfer;
|
||||||
|
- a new physical route or camera capture;
|
||||||
|
- second K1 or changed mount generalization;
|
||||||
|
- open-world and adversarial evaluation.
|
||||||
|
|
||||||
|
The existing E36 audit and its Ops card remain retained so transfer work can
|
||||||
|
resume later without reconstructing history.
|
||||||
@@ -2,7 +2,11 @@
|
|||||||
|
|
||||||
Date: 2026-07-27
|
Date: 2026-07-27
|
||||||
|
|
||||||
Status: accepted; transfer replay blocked by missing source provenance
|
Status: accepted audit; transfer priority deferred by ADR 0030
|
||||||
|
|
||||||
|
Program update: ADR 0030 makes RAVNOVES00 reference-source maturation the
|
||||||
|
current critical path. This audit remains immutable planning evidence for a
|
||||||
|
later transfer cycle; TEST007 and E36 are not current product blockers.
|
||||||
|
|
||||||
## Context
|
## Context
|
||||||
|
|
||||||
@@ -58,9 +62,10 @@ contain the required camera modality or accepted physical-source provenance.
|
|||||||
|
|
||||||
- A9 has completed its catalog-admission sub-gate, but E36 transfer remains
|
- A9 has completed its catalog-admission sub-gate, but E36 transfer remains
|
||||||
blocked.
|
blocked.
|
||||||
- The next admissible action is provenance recovery or a new explicit binding
|
- When ADR 0030 later reactivates transfer work, the admissible action is
|
||||||
artifact for TEST007, based only on primary evidence. It is not threshold
|
provenance recovery or a new explicit binding artifact for TEST007, based
|
||||||
tuning and does not rerun E32–E35.
|
only on primary evidence. It is not threshold tuning and does not rerun
|
||||||
|
E32–E35.
|
||||||
- If both bindings become available, the same audit can be rerun. Only an
|
- If both bindings become available, the same audit can be rerun. Only an
|
||||||
eligible result authorizes packaging the frozen E32–E35 transfer replay.
|
eligible result authorizes packaging the frozen E32–E35 transfer replay.
|
||||||
- Until then, Mission Core publishes no LAB E36 page and claims no
|
- Until then, Mission Core publishes no LAB E36 page and claims no
|
||||||
|
|||||||
@@ -0,0 +1,78 @@
|
|||||||
|
# ADR 0030 — RAVNOVES00 reference-source maturation before transfer
|
||||||
|
|
||||||
|
Date: 2026-07-27
|
||||||
|
|
||||||
|
Status: accepted
|
||||||
|
|
||||||
|
## Context
|
||||||
|
|
||||||
|
Mission Core has completed A0–A8 on the immutable RAVNOVES00 source and has a
|
||||||
|
source-catalog audit for the later E36 transfer gate. The immediate product
|
||||||
|
objective is not open-world autonomy or cross-route generalization. It is a
|
||||||
|
bounded near-industrial transport product operating at low speed in a known
|
||||||
|
location on known routes, with simple tasks such as movement from point A to
|
||||||
|
point B.
|
||||||
|
|
||||||
|
Attempting second-source transfer now would split effort before the
|
||||||
|
source-scoped perception architecture, evidence workflow and operator product
|
||||||
|
have reached a useful quality level. A new route and another camera view can be
|
||||||
|
recorded later, after the current reference path is stable enough to make that
|
||||||
|
transfer test meaningful.
|
||||||
|
|
||||||
|
## Decision
|
||||||
|
|
||||||
|
1. RAVNOVES00 is the only active physical reference source for the current
|
||||||
|
product-maturation cycle.
|
||||||
|
2. E36 and TEST007 are deferred. The existing E36 catalog audit remains valid
|
||||||
|
historical planning evidence, but transfer is no longer the current
|
||||||
|
critical-path gate.
|
||||||
|
3. No new physical route or camera capture is required until RAVNOVES00 reaches
|
||||||
|
the source-scoped product acceptance defined below.
|
||||||
|
4. All changes remain append-only immutable LAB results over the same
|
||||||
|
RAVNOVES00 source. Accepted generations are never rewritten.
|
||||||
|
5. The next gate must define and freeze a reviewed development/validation split
|
||||||
|
inside RAVNOVES00 before any new quality tuning.
|
||||||
|
6. The target is at least `90%` on each task-relevant validation dimension:
|
||||||
|
object-versus-background decision correctness, camera↔geometry association
|
||||||
|
correctness and current-versus-stale state correctness.
|
||||||
|
7. The `90%` target is source-scoped. It is not a claim of universal detector
|
||||||
|
accuracy, cross-site generalization, safety certification or open-world
|
||||||
|
autonomy.
|
||||||
|
8. Average quality cannot waive hard invariants: source accounting remains
|
||||||
|
complete, missing evidence remains unknown, false free-space claims remain
|
||||||
|
forbidden and degraded input must fail visibly.
|
||||||
|
9. The same reference cycle may extend reusable product controls, evidence
|
||||||
|
viewers, LAB templates and comparison workflows under the existing Design
|
||||||
|
Guideline and component architecture canons.
|
||||||
|
10. A second capture becomes the transfer gate only after the source-scoped
|
||||||
|
release candidate is accepted and the operator explicitly authorizes new
|
||||||
|
collection.
|
||||||
|
|
||||||
|
## Product envelope
|
||||||
|
|
||||||
|
The current product assumption is intentionally bounded:
|
||||||
|
|
||||||
|
- known or pre-mapped industrial location;
|
||||||
|
- declared routes and simple logistics missions;
|
||||||
|
- low-speed motion and conservative stopping on uncertainty;
|
||||||
|
- no adversarial environment, tactical autonomy or strategic replanning;
|
||||||
|
- no implication that a `90%` perception score alone authorizes actuation.
|
||||||
|
|
||||||
|
This narrower envelope reduces unnecessary complexity, but it does not remove
|
||||||
|
the requirement for explicit unknown/stale states, watchdogs, command expiry or
|
||||||
|
independent physical safety controls.
|
||||||
|
|
||||||
|
## Consequences
|
||||||
|
|
||||||
|
- The active critical path moves from E36 transfer to RAVNOVES00
|
||||||
|
reference-source quality and product closure.
|
||||||
|
- The immediate next experiment is a source-scoped acceptance-contract LAB,
|
||||||
|
not another data collection or another transfer audit.
|
||||||
|
- Future quality iterations may change algorithms, models and thresholds only
|
||||||
|
through new immutable profiles and results evaluated against the frozen
|
||||||
|
validation split.
|
||||||
|
- Product UI work is justified when it exposes a reusable task, method,
|
||||||
|
evidence, result or comparison contract. Run-specific decorative or
|
||||||
|
temporary interfaces remain forbidden.
|
||||||
|
- Generalization remains explicitly unproved until a later independently
|
||||||
|
recorded source is admitted and replayed.
|
||||||
@@ -106,3 +106,12 @@ rerun this admission audit and then package E32–E35 unchanged for transfer.
|
|||||||
If they cannot be proven, A9 remains blocked until an operator separately
|
If they cannot be proven, A9 remains blocked until an operator separately
|
||||||
authorizes a new capture with calibration and mount identities recorded at
|
authorizes a new capture with calibration and mount identities recorded at
|
||||||
acquisition time.
|
acquisition time.
|
||||||
|
|
||||||
|
## Program priority update
|
||||||
|
|
||||||
|
ADR 0030 was accepted after this audit. It preserves the audit and its blocked
|
||||||
|
result but defers TEST007 provenance recovery, E36 replay and new physical
|
||||||
|
collection. The active path is now RAVNOVES00 source-scoped quality, product
|
||||||
|
workflow and reference release acceptance. This report remains the immutable
|
||||||
|
record of the catalog decision; its “next admissible step” applies only when
|
||||||
|
transfer work is explicitly resumed.
|
||||||
|
|||||||
@@ -151,3 +151,11 @@ retuning on an eligible second mounted real source. The source catalog must be
|
|||||||
audited first. If no recording contains the required camera, LiDAR, pose,
|
audited first. If no recording contains the required camera, LiDAR, pose,
|
||||||
time, calibration and mount identities, E36 remains explicitly blocked; no
|
time, calibration and mount identities, E36 remains explicitly blocked; no
|
||||||
empty LAB, fabricated result or new capture is created by default.
|
empty LAB, fabricated result or new capture is created by default.
|
||||||
|
|
||||||
|
## Later program priority update
|
||||||
|
|
||||||
|
ADR 0030 supersedes the sequencing statement above without changing this
|
||||||
|
immutable E35 result. RAVNOVES00 reference-source quality and product closure
|
||||||
|
is now the active path. TEST007, E36 and new physical collection are deferred
|
||||||
|
until the RAVNOVES00 reference release is accepted and transfer work is
|
||||||
|
explicitly resumed.
|
||||||
|
|||||||
Reference in New Issue
Block a user