@@ -11,7 +11,7 @@ predictable, and based on the approved NODE.DC Design Guideline.
This document governs Control Station product UI, laboratory summaries,
evidence viewers, selected-LAB evidence reports, and the boundary with
implementation history and architecture narratives in Ops.
verified delivery summaries in Ops.
It complements `docs/15_LABORATORY_RUN_CANON.md`, which governs publication and
provenance. New non-LAB surfaces and their placement are governed by
`docs/19_PRODUCT_SURFACE_EXTENSION_PROTOCOL.md`.
@@ -154,7 +154,7 @@ viewer:
Show short product names and exact identities only where they aid comparison.
Long manifests, hashes, implementation file lists, validation logs, and the
history of rejected approaches belong in Ops.
history of rejected approaches belong in local engineering evidence.
## Evidence viewer contract
@@ -312,33 +312,18 @@ Do not render:
- a separate layout because one LAB has a different algorithm.
If information is necessary only for development or governance, place it in
Ops, an ADR, a runbook, or developer tooling. Evidence needed to verify the
local engineering evidence, an ADR, a runbook, or developer tooling. Evidence needed to verify the
selected LAB belongs in its product evidence report.
## Ops engineering report
## Ops delivered results — owner revision, 2026-10-09
The complete implementation history and architecture narrative for a LAB or
milestone lives in the Mission Core Ops project. It links the canonical product
evidence report instead of retyping its metrics. Keep the issue description
concise and place the narrative in titled structured blocks. Use this order:
1. Objective and architecture stage.
2. Decision question and hypothesis.
3. Immutable source evidence and tested bounds.
4. Method, preprocessing, models, algorithms, tools, and identities.
5. Worker/runtime topology and resource policy.
6. Experimental changes and implementation.
7. Validation and reproduced evidence.
8. Quantitative and qualitative results.
9. Regressions, rejected approaches, and honest limitations.
10. Decision: continue, revise, reject, or promote.
11. Next stage and authority that remains forbidden.
12. Acceptance checker with short verifiable items.
The product summary and selected-LAB evidence report are projections of
immutable runtime evidence, never a second independent narrative. Ops adds
engineering context, ownership, implementation history, and future work; it is
not a substitute for source/runtime/metric/artifact proof.
Ops contains concise, verified outcomes: what works, what implementation is used,
and the accepted scope. Do not append intermediate runs, failed experiments,
architecture proposals, hypotheses or future plans. Consolidate superseded
intermediate blocks when a result is delivered. Keep detailed engineering
reports, hashes, validation logs and negative evidence locally under the
repository's established evidence lifecycle. A partial test never becomes a
claim of complete product acceptance.
## Review gate before A3