feat(perception): stabilize pre-capture methodology

This commit is contained in:
DCCONSTRUCTIONS
2026-07-28 17:47:06 +03:00
parent 1f20e0d7d9
commit d729abab31
65 changed files with 9698 additions and 152 deletions
+13 -1
View File
@@ -32,12 +32,24 @@ candidate is accepted:
- new perception and product iterations use RAVNOVES00;
- each iteration creates a new immutable LAB and never rewrites an older one;
- TEST007, E36 and new physical collection are deferred, not required gates;
- TEST007 and E36 replay are deferred, not required current gates;
- no agent may initiate or imply a new capture without explicit operator
authorization;
- the active quality target is at least `90%` on each frozen task-level
validation dimension, never one unqualified aggregate accuracy number.
ADR 0032 corrects the present validation meaning. E37's 146-row slice is
historical evaluated visible engineering validation: its labels are not
independent truth and its development/evaluation groups overlap. It remains an
immutable comparison contract, but it cannot close a blind accuracy gate.
Prediction packages must exclude truth, split, severity and scoring material,
and evaluation must join those artifacts only after prediction.
The owner has authorized preparation for a later same-K1/new-route recording,
not agent-initiated collection. E43 freezes that future protocol before data
exists. Until the recording is supplied, no LAB result, metric or transfer
claim is created for it.
This policy is a development priority, not a universality claim. Later
second-source transfer remains required before any cross-route or cross-camera
generalization statement.