Commit Graph
2 Commits
Author SHA1 Message Date
DCCONSTRUCTIONS ade3c19d2a Guide local goals around observed obstacles and finish native recovery 2026-10-09 13:06:04 +03:00
DCCONSTRUCTIONS 6a89f809a4 fix(simulation): bound Nav2 heading discretization by rover geometry
Use pinned Smac Hybrid with a geometry-derived angular grid so rectangular starts are not rejected by coarse lattice headings. Keep the full padded footprint, unknown-space veto, TTLs, and native controller/behavior ownership.

Validated on the same archived costmap, five native pass/block scenarios, HTTP/PCL/Nav2 lifecycle and rear-obstacle checks, and 12 CPU tests. Original-route live check moved 20.13 m before its fixed wall budget; the 30 m integration criterion and full-route acceptance remain open.
2026-10-08 13:07:24 +03:00