Commit Graph
6 Commits
Author SHA1 Message Date
DCCONSTRUCTIONS c4d4ea4cf8 Measure Worker video delivery separately from simulation cadence 2026-10-09 09:33:52 +03:00
DCCONSTRUCTIONS c4622332e6 Reconsider transient native planner rejections after bounded backoff 2026-10-09 08:40:52 +03:00
DCCONSTRUCTIONS 8c520ba32e Bound urban route clearance preference and expose Nav2 costmap diagnostics 2026-10-09 07:48:20 +03:00
DCCONSTRUCTIONS a14158e483 Bind Nav2 route transitions to current observed body support
Return a separate positive-surface body receipt before reaching a guide vertex. Keep mission arrival and command admission independent, reject stale transaction reuse, and include the bridge helper in module identity. Validate the actual Nav2 plan entry with observed, unknown and obstructed support.
2026-10-08 23:54:38 +03:00
DCCONSTRUCTIONS 31b74e4571 Add prepared urban route guidance to Gaussian simulation planning
Introduce a content-bound scene route provider, advisory runtime graph and plan-preview-launch workflow. Preserve live sensing authority and retire blocked intermediate goals without discarding final-arrival evidence. Bound native visual context losslessly and provide verified cache relocation. Full Maroseyka route qualification remains open.
2026-10-08 23:42:26 +03:00
DCCONSTRUCTIONS d0e5f90952 Preserve installed operator workspace before consolidation
Local preservation snapshot, not a new deployment or simulation acceptance.
2026-10-08 09:59:51 +03:00