ADR 0030 — RAVNOVES00 reference-source maturation before transfer
Date: 2026-07-27
Status: accepted
Context
Mission Core has completed A0–A8 on the immutable RAVNOVES00 source and has a source-catalog audit for the later E36 transfer gate. The immediate product objective is not open-world autonomy or cross-route generalization. It is a bounded near-industrial transport product operating at low speed in a known location on known routes, with simple tasks such as movement from point A to point B.
Attempting second-source transfer now would split effort before the source-scoped perception architecture, evidence workflow and operator product have reached a useful quality level. A new route and another camera view can be recorded later, after the current reference path is stable enough to make that transfer test meaningful.
Decision
- RAVNOVES00 is the only active physical reference source for the current product-maturation cycle.
- E36 and TEST007 are deferred. The existing E36 catalog audit remains valid historical planning evidence, but transfer is no longer the current critical-path gate.
- No new physical route or camera capture is required until RAVNOVES00 reaches the source-scoped product acceptance defined below.
- All changes remain append-only immutable LAB results over the same RAVNOVES00 source. Accepted generations are never rewritten.
- The next gate must define and freeze a reviewed development/validation split inside RAVNOVES00 before any new quality tuning.
- The target is at least
90%on each task-relevant validation dimension: object-versus-background decision correctness, camera↔geometry association correctness and current-versus-stale state correctness. - The
90%target is source-scoped. It is not a claim of universal detector accuracy, cross-site generalization, safety certification or open-world autonomy. - Average quality cannot waive hard invariants: source accounting remains complete, missing evidence remains unknown, false free-space claims remain forbidden and degraded input must fail visibly.
- The same reference cycle may extend reusable product controls, evidence viewers, LAB templates and comparison workflows under the existing Design Guideline and component architecture canons.
- A second capture becomes the transfer gate only after the source-scoped release candidate is accepted and the operator explicitly authorizes new collection.
Product envelope
The current product assumption is intentionally bounded:
- known or pre-mapped industrial location;
- declared routes and simple logistics missions;
- low-speed motion and conservative stopping on uncertainty;
- no adversarial environment, tactical autonomy or strategic replanning;
- no implication that a
90%perception score alone authorizes actuation.
This narrower envelope reduces unnecessary complexity, but it does not remove the requirement for explicit unknown/stale states, watchdogs, command expiry or independent physical safety controls.
Consequences
- The active critical path moves from E36 transfer to RAVNOVES00 reference-source quality and product closure.
- The immediate next experiment is a source-scoped acceptance-contract LAB, not another data collection or another transfer audit.
- Future quality iterations may change algorithms, models and thresholds only through new immutable profiles and results evaluated against the frozen validation split.
- Product UI work is justified when it exposes a reusable task, method, evidence, result or comparison contract. Run-specific decorative or temporary interfaces remain forbidden.
- Generalization remains explicitly unproved until a later independently recorded source is admitted and replayed.