3.3 KiB
Confirmed board shutdown
The operator opens the existing Бортовой компьютер settings window and
uses the canonical power header action beside move/close. The danger
confirmation names the board; cancelling or Escape sends no command. This
extends the existing window: a new fleet route or a terminal command form is
not needed. Disabled, pending, accepted, expired and OS failure states are
visible. An acknowledgement never claims proof that the host has powered off.
POST /api/v1/fleet/{vehicle_id}/power/shutdown is local-operator-only, takes
an expected process epoch and a request UUID, and accepts no command text.
GET .../power is no-store. Power support and its last receipt are bounded
latest state in RAM. There is no persistent command or historical telemetry.
Node advertises missioncore.node-power/v1 and a random per-process epoch on
the existing authenticated heartbeat. Core requires a capability less than
12 seconds old. Commands are bound to the current pairing and expire after
20 seconds. Node rejects wrong epochs, bindings, methods and expired commands;
it records acceptance, then waits for the matching Core acknowledgement before
invoking the OS once. A lost ack expires without execution. Reconnection,
process restart and duplicate delivery cannot replay an old power-off.
Clocks must agree within the short command window; disagreement fails closed.
The fixed executor uses systemd-logind PowerOff(false) over the system bus
via /usr/bin/busctl. Capability discovery calls only CanPowerOff.
The installer-owned policy grants the mission-core-node account only
org.freedesktop.login1.power-off and power-off-multiple-sessions.
It grants neither reboot, arbitrary service control nor ignoring inhibitors.
See the systemd interface.
Node112 is an incremental package over qualified Node111; the Node binary, provenance and package version change, and one policy is added. Other driver payloads and maintainer scripts remain byte-identical. The full builder includes the same policy. Distribution profile stays Ubuntu 24.04 amd64. Removing the package or installing the pinned Node111 rollback removes the package-owned policy; operator/runtime data stays intact. Downgrade is an explicit installer operation, never an automatic retry of shutdown.
Validation uses a fake OS executor for actual power-off. Live acceptance checks
the installed capability and opens/cancels the confirmation; it deliberately
does not shut down Rover006. Prepared-board acceptance does not claim a new
clean-image qualification. Detailed local evidence lives in
outputs/board-power-20261104.
The release launcher also resumes a power-interrupted, half-configured Node
package only when it is the same version carried by the release and the only
package needing configuration. Pending cache triggers for dbus,
desktop-file-utils, gnome-menus and hicolor-icon-theme are allowed; they remain
for the normal APT transaction. It runs
dpkg --no-triggers --configure mission-core-node under the existing
CAN maintenance barrier, then continues normal APT installation. It never runs
dpkg --configure -a, deletes locks or interrupts a package manager. Recovery
is installer-owned; a different version or another incomplete package stops it.