Record verified Ops publication of onboard K1 laboratory checkpoint

This commit is contained in:
DCCONSTRUCTIONS
2026-09-07 21:50:38 +03:00
parent cc90709919
commit 1832943558
@@ -124,3 +124,27 @@ contracts; they do not establish field reliability or a long-running rate.
Decision: retain the working checkpoint and keep broader onboard connection
acceptance open. No claim of production reliability, autonomous mission
readiness, complete Node requirements, or multi-device generalization is made.
## Ops publication verified
On the owner's explicit request to publish the complete current work set, the
official NODE.DC Ops MCP applied and read back these updates on 2026-09-07:
- MISSIONCOR-76, issue `e48dc205-e73b-42c9-8b5c-b8d52f70267a`: full consolidated
engineering report and open acceptance matrix in comment
`637e7d39-5c39-4c25-880f-888ea74ba981`. All 26 architecture baseline blocks and
the baseline description remain exactly unchanged. State remains In Progress.
- MISSIONCOR-3, issue `9b75d0cd-4c55-44a6-ada3-558587991be2`: eight titled
current-result/architecture/implementation/validation/delivery/checker blocks
added ahead of the 71 unchanged historical blocks. Description distinguishes
direct Mac acceptance from the onboard laboratory result. State is In Progress;
the complete multi-scenario onboard acceptance item remains unchecked.
- MISSIONCOR-2, issue `3e4d7128-ca62-408c-bdf8-820435a79a89`: one dated onboard
laboratory result block and concise summary added; all nine prior blocks
retained exactly. State remains In Progress.
Readback confirms the new block bodies/checker values exactly, the expected
comment identity and the preserved baseline/history. No card or comment was
deleted or archived. No new physical task, test campaign or automation was
started. The earlier R10 Ops approval failure remains a historical fact; this
publication succeeded under the owner's new explicit request.